Introducing the process of work from removing the refrigerant to applying the moisture treatment!
We would like to introduce the installation work for our fluid stirring device 'αESG'. We will remove the currently used refrigerant and insert α-HT into the cut pipes. After performing brazing, we will apply moisture treatment after the piping work is completed, and the construction will be finished. 【Flow of Installation Work】 1. Remove the currently used refrigerant 2. Insert α-HT into the cut pipes 3. Perform brazing 4. Apply moisture treatment after the piping work *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
ESG Technologies is a company that plans, manufactures, and proposes related products and systems for the environment, energy conservation, and renewable energy to companies that are serious about energy saving and CO₂ reduction measures.