Basic and economical! It is possible to issue an alarm in response to excessive vibration.
The "5550" is a basic and economical mechanical vibration switch that features a simple and reliable over-center snap action (mass and spring mechanism). The 5550G, with a housing suitable for use in high explosion-proof areas (IIC), is also part of the lineup. It is possible to add an optional remote reset and restart function. Additionally, an adjustable screw for setting point adjustment can also be retrofitted. 【Features】 ■ Equipped with a simple and reliable over-center snap action ■ Automatically shuts down the device or triggers an alarm in case of excessive vibration ■ An optional gold-plated plate is available to accommodate highly corrosive environments *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Product Specifications (Example)】 ■Amplitude Range: 0 to 16G (pk) ■Frequency Range: 0 to 60Hz (0-3600rpm) ■Output Port: 1 (3/4"NPT or M20x1.5) *Refer to option "E" ■Field Reset: Plunger type (button on the housing) ■Operating Temperature: -40 to +70℃ / -53℃ to +70℃ ■Weight: 1.8kg *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
BATROSS Co., Ltd. was established as a new company within the KJC Group. In collaboration with the U.S. company Metrics, we will focus on planning and selling electronic devices such as vibration sensors and related components, marking the group's first challenge in the BtoB market. The KJC Group started in 2003 with a single Edison chopstick. We have always prioritized quality and developed products based on thoroughly responding to customer feedback. We have primarily focused on the BtoC market, particularly in the baby sector. Long ago, Michelangelo was commissioned by the Pope to paint a massive ceiling mural of about 300 tsubo (approximately 1,000 square meters). With no preparation time, he made a sudden transition from sculptor to painter. Through passion and effort, he undertook the challenging mural work for four years, achieving the great masterpiece "The Creation of Adam." BATROSS aims to surpass the achievements of "The Creation of Adam" and enters the BtoB market with passion and focus. We will advance our business as a company that plays a part in the global expansion of the KJC Group.