A case of introducing a soil microbial film combined treatment purification tank with low power consumption!
We would like to introduce a case study of our 'Sofeel' system implemented at Dogashima Seihama Park (Geopark) in Nishiizu Town, Shizuoka Prefecture. Due to the inability to bring electricity to the site for the renovation plan of the existing restroom, the installation of a purification tank combined with solar power generation was considered, and our product, which has low power consumption, was adopted. The treatment capacity is for 96 people, with a capacity of 2.1m3/day. 【Case Overview】 ■ Construction Location: Nishiizu Town, Shizuoka Prefecture ■ Construction Period: 2016 ■ System: Sofeel Discharge ■ Treatment Capacity: 96 people, 2.1m3/day ■ Client: Nishiizu Town ■ Facility Overview: Public restroom in the park *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
The 21st century is referred to as the "Era of the Environment." The mission of environmental creators is significant, and there are great expectations from various sectors. In particular, creating towns that are kind to both people and the planet is considered an urgent issue in modern times. "Designing while protecting the natural environment is the culture and 'heart' of the town. The landscape and space of the completed facilities represent the beautiful 'form' of the town." With this concept, we pursue what truly constitutes a comfortable environment and steadily realize it based on high levels of safety and security! The Sofeel Association, which has members nationwide, possesses the mobility to respond with a complete system to the necessary ideas, materials, and technological capabilities required to create such an ideal environment.


![[Case Study of Sofir] KIN Sunrise Beach (Management Building Side)](https://image.mono.ipros.com/public/product/image/460/2001055912/IPROS1643539492940443084.jpg?w=280&h=280)
![[Case Study of Sofir] Mukojima Sports Park Off-Grid Toilet](https://image.mono.ipros.com/public/product/image/77c/2001055923/IPROS18014334505321887652.jpg?w=280&h=280)
![[Case Study of Sofir] Decontamination Dump Waiting Area within the Intermediate Storage Facility Zone](https://image.mono.ipros.com/public/product/image/4e2/2001055927/IPROS83724724985056695592.png?w=280&h=280)
![[Case Study of Sofir] 07 Ishigaya Cemetery](https://image.mono.ipros.com/public/product/image/ffa/2001482882/IPROS11590911370920364918.jpg?w=280&h=280)
![[Case Study of Sofir] Orikino Matsukōen](https://image.mono.ipros.com/public/product/image/bd5/2001483911/IPROS12220312977121769852.png?w=280&h=280)
![[Water Treatment Facility] Small-scale Combined Treatment Sewage System for 5 people / 7 people / 10 people](https://image.mono.ipros.com/public/product/image/18b/2000463591/IPROS78581647117533474301.png?w=280&h=280)

![[Water Treatment Facility] Small-scale combined treatment septic tank for 14 to 50 people](https://image.mono.ipros.com/public/product/image/624/2000463594/IPROS73403343346512606965.jpeg?w=280&h=280)

![[Cement News No. 90] Three Key Points for Installation Work in Cold Regions](https://image.mono.ipros.com/public/product/image/f4e/2001505490/IPROS74155981226541986055.png?w=280&h=280)
![pH Neutralization Device [Chemical Injection Method] PHU Series](https://image.mono.ipros.com/public/product/image/149/240745001/IPROS69177479345224392552.jpeg?w=280&h=280)
![Ion exchange resin [Low-cost for special applications such as pure water and precious metal recovery!]](https://image.mono.ipros.com/public/product/image/a9e/2000432501/IPROS83848547029201264434.png?w=280&h=280)

