When it comes to asbestos, leave everything to us!
STEP 1 Preliminary Investigation Data collection / On-site survey / Sampling survey / Asbestos analysis STEP 2 Construction Planning Based on the results of the preliminary investigation, create and propose a removal work plan STEP 3 Notification Procedures Notify and process the construction plan with the relevant supervising authorities STEP 4 Removal Work Protective measures: Enclose with asbestos dust containment sheets, maintain a negative pressure state, and prevent dispersion outside the security zone. Removal work: Apply dust suppression agents / Asbestos removal / Selective dismantling (Level 2) Environmental measurement in the work area: Conduct measurements at the entrances and exits of the security room, exhaust outlets, and property boundaries to confirm the impact on the surroundings. Packaging: Package according to the disposal methods of the final disposal site. Removal of protective measures: Spray solidifying agents over the entire area within the protective measures and remove them after measuring to ensure no asbestos dispersion into the air. STEP 5 Transportation Drivers with knowledge of asbestos will carry out safe collection and transportation. STEP 6 Landfill Treatment or Melting Landfill at a specially controlled disposal site. Items that do not meet landfill standards due to heavy metal content, etc., will be melted. STEP 7 Completion of Work Create and store work records / Report to relevant supervising authorities.
Inquire About This Product
basic information
For inquiries about asbestos removal, please feel free to contact our sales representative or the following.
Price range
Delivery Time
Applications/Examples of results
Points for Asbestos Removal The asbestos content subject to regulatory control was revised to 0.1 weight% or more as of September 1, 2006. If asbestos is found at a concentration of 0.1 weight% or more, efforts must be made to manage and maintain it to prevent dispersion into the surrounding area. Additionally, under the Building Standards Act, when renovating buildings that contain sprayed asbestos, it is mandatory to enclose, seal, or remove the asbestos. Asbestos is also used in equipment and other items. In addition to building materials, asbestos is used in insulation and protective materials for analytical instruments. When dismantling equipment, a security zone must be established to prevent dispersion, and asbestos must be handled appropriately. For inspection, analysis, dismantling, and removal of equipment, please contact Miyama. Sampling will also be conducted by dedicated staff. Trust Miyama with asbestos analysis. Asbestos sampling (specimen collection) should be entrusted to the dedicated staff at Miyama, which includes asbestos work supervisors, asbestos diagnosticians, and investigators of asbestos-containing building materials. Furthermore, our company can handle everything from asbestos analysis in building materials to environmental measurements within the workplace.
Detailed information
-
Removal work
-
Removal work
catalog(1)
Download All CatalogsCompany information
Miyama Corporation has been striving to provide technologies, products, and services that meet the demands of a wide range of industrial users as a specialized group in environmental technology since its founding. Our characteristic approach is to deeply consider the various environmental challenges arising in different industrial activities, taking into account the specific situations and background factors of our clients, and to work together with them to devise unique ideas and technologies for solutions. We believe that environmental technology is a system of technologies that connects all industrial and social activities to a favorable cyclical process for the Earth's environment. For this reason, we at Miyama will continue to advance as a comprehensive environmental company, capable of presenting richer value to industry and society through environmental technology.