Protect electronic and control equipment from corrosion and work environments from odors. 'Easy installation on existing equipment!'
<Mora Filter: What is it?> Achieves simultaneous removal of hydrogen sulfide, ammonia, acidic/basic gases, and mitigates corrosion of terminals in electronic, electrical, and control equipment! Furthermore, it can simultaneously remove foul-smelling molecules such as methyl mercaptan and trimethylamine, improving the working environment! It solves both safety issues in plant equipment and workplace environment improvements at the same time. <Features> ■ Corrosive Gases | This filter can remove different types of gases, such as sulfur compounds "hydrogen sulfide" and nitrogen compounds "ammonia," all at once. ■ Odorous Gases | Effective in removing "methyl mercaptan" and "trimethylamine," greatly improving odors in the working environment. ■ Each measure does not involve high costs for installing large equipment; simply attach the filter to existing gas emission points! ■ Available from a basic size of 500mm square to custom orders tailored to the shape of the installation location. *For details, please request a catalog or download the PDF data from the "Ipros site"
Inquire About This Product
basic information
The Mora Filter is capable of simultaneously removing sulfur-based compounds such as "hydrogen sulfide," nitrogen-based compounds like "ammonia," and acidic/basic gases. It slows down terminal corrosion of electronic, electrical, and control equipment, and addresses the issue of odor-causing gases in the workplace, such as "methyl mercaptan" and "trimethylamine," as well as "acetic acid" and "formaldehyde." This multi-filter can comprehensively tackle corrosion and odor issues with a single filter. <Specifications> Base Material: "Non-woven Fabric" - FT-01: 8-9mm thickness - FT-02: 4-5mm thickness (Air Conditioner Type) Base Material: "Sponge" - SP-01: 5mm thickness <Size> 500mm × 500mm (Custom orders are accepted to fit installation locations/equipment) <Replacement Interval> 3 to 6 months (This may vary depending on the installation location. Thank you for your understanding.) If you have any questions regarding handling, please feel free to contact us at the information below. Contact: EPJ INC. TEL: +81 3-5643-8137 FAX: +81 3-5643-8138 Email: info@epj-inc.co.jp
Price range
P1
Delivery Time
P3
※Approximately 10 days of actual work.
Applications/Examples of results
<Required Facilities> - Wastewater treatment facility (drainage treatment) - Sewage treatment plant - Cleaning factory - Pulp factory - Geothermal power plant - Biogas power plant - Sewer facilities (building pits, etc.) - Agricultural community drainage facilities - Seawater utilization facilities (nuclear, thermal, oil, steelmaking, etc.) - Electronic component assembly factory - Semiconductor data center, etc. <Example of Countermeasure Locations> [Electrical Room] - Cable pit - Air intake/exhaust - Air conditioning intake - Distribution board air intake - Bottom of distribution board cable penetration, etc.
Detailed information
-
To electronic, electrical, and control equipment galleries, etc.
-
Cable penetration section at the bottom of the electronic, electrical, and control panel.
-
To wastewater treatment facilities in general
-
Labor environment to air conditioning facilities.
-
Labor environment, even for spot coolers.
-
"Control panel" (before installation)
-
"Control panel" (after installation)
-
"Duct" (before installation)
-
"Duct" (after installation)
Company information
A manufacturer specialized in planning, design, and engineering. We focus on product development to solve various issues at construction sites, providing innovative, cutting-edge, and ecological products. Please feel free to contact us.