We will introduce a case where processing was carried out according to the drawings, including plans from trial to mass production!
We would like to introduce a case study of cost reduction for special processed products made of polyacetal (POM). We are planning from trial to mass production, but there was a concern about whether the detailed dimensions in the drawings could be processed. After discussions with the customer, we determined that the processing of the product was feasible. Regarding the delivery time, we adjusted it to meet the customer's proposed schedule, and ultimately we were able to deliver ahead of schedule. 【Case Overview】 ■ Issues - The dimensions are detailed, but is it possible to process according to the drawing instructions? - The material is being considered as polyacetal (POM). - Can we meet the customer's desired delivery time (mass-produced items should be delivered within a month at the latest)? ■ Resolution Points - After discussions, we determined it was feasible, and we were ultimately able to deliver ahead of schedule. *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Company information
Since its establishment in 1912, our company has been a specialized trading company dealing primarily in industrial materials, focusing on rubber and plastic products used in various equipment and plants. In particular, we have a rich inventory of hoses, belts, and gaskets, closely connected to the regional industry. Please feel free to contact us.