Introducing the renovation of lighting facilities to LED in the hall, stairs, and musicians' room!
We would like to introduce a case study of the "LED lighting installation work" carried out by our company. The installation location is the Century Orchestra House in Toyonaka City, Osaka, including the hall, stairs, and musicians' room. As part of the lighting equipment repair work, we replaced 123 indoor lights with LED lighting. 【Case Overview】 ■ Date of Implementation: January 2024 ■ Location: Century Orchestra House, Toyonaka City, Osaka ■ Content of Work: Replacement of 123 indoor lights with LED lighting *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company primarily deals with new environmental catalysts such as "Clean Fix®," "Polar Inversion Lightning Rod," and "SPD (Surge Protective Device)." We also carry out general electrical installation work and telecommunications installation work. Please feel free to contact us for LED lighting replacement work from mercury lamps and fluorescent lamps at any time.