[Construction Examples] Parts Factory: Gap and Void Filling Work, Vibration Suppression Work
Preventive measures for vibrations in factories equipped with high-precision devices! Filling the voids under the concrete floor in a short construction period.
We would like to introduce a case of "void filling work and vibration suppression work" carried out at a parts factory in Aichi Prefecture. The parts factory is equipped with high-performance machining equipment. Due to the ground conditions where the factory is built, a few millimeters of void filling was implemented as a preventive measure for vibration suppression. The construction area was approximately 279m2, and the construction period was two days during the daytime. The work was carried out without moving any items within the factory after taking protective measures before construction. 【Case Overview】 ■ Construction Area: Approximately 279m2 ■ Area: Aichi Prefecture ■ Construction Period: Two days during the daytime *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.