[Construction Example] Elementary School: Floor Slab Settlement Correction Work
Utilizing spring break for quick subsidence correction! The cycle from construction to restoration is short.
Here is an example of "settlement correction" performed at an elementary school in Miyagi Prefecture. Due to floor settlement, gaps occurred between the classroom walls and ceiling, causing the classroom door to tilt and hindering the opening and closing of the lock. The overall floor level of the classroom and hallway was corrected from a maximum settlement of 69mm to within -18mm, and the gaps that had formed between the walls and ceiling before the work were also improved. 【Case Summary】 ■ Construction Area: 331m2 ■ Maximum Settlement: 69mm ■ Area: Tagajo City, Miyagi Prefecture / Elementary School ■ Construction Period: 4 days *For more detailed information about the case, please refer to the related link. For further details, please check the PDF document or feel free to contact us.
Inquire About This Product
basic information
*You can view the detailed information about the case from the related link. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*You can view the detailed information about the case from the related link. For more details, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.