Assuming that the EV vehicle is charged to the extent that it can travel about 50 km.
Here is an introduction to the charging time during EV rescue. With an ICE (internal combustion engine), it is possible to drive approximately 50 km after the fuel warning light comes on. The Nissan Leaf has a range of 450 km with a 60 kWh battery, which translates to 7.5 km/kWh. Considering 5 km/kWh, about 10 kWh of charging is needed. If charged with a fast charger set to 50 kW, it is possible to charge 10 kWh in about 12 minutes. If charged with a 30 kW setting, it is possible to charge 10 kWh in about 20 minutes. 【Charging Time】 ■ When charged with a fast charger set to 50 kW: approximately 12 minutes for 10 kWh of charging ■ When charged with a 30 kW setting: approximately 20 minutes for 10 kWh of charging *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company specializes in the manufacturing of aluminum casting and electric equipment, primarily focused on vehicle-mounted power generation systems. We are committed to continuously striving to meet your expectations at a high level, with all employees working together in unison to advance our business. ■ Aluminum Casting and Processed Products We offer integrated production from high-quality aluminum casting to machining, and we can also accommodate small batch prototypes. We provide high-quality products with thin walls, high strength, and complex shapes. ■ Special Generators (NMG Power Generation System) A vehicle-mounted large-capacity power generation system that contributes to eco-friendliness. By enhancing the power generation capacity of automotive engines, we have expanded the applications of automobiles.