A case where we proposed utilizing existing equipment to efficiently respond with the minimum necessary number of units.
We would like to introduce a case where the FEB-DD series "D.D-Multi" was implemented at a factory in Fukui Prefecture. In response to the request for effective heatstroke measures in a large factory, we proposed utilizing existing equipment to efficiently address the situation with the minimum necessary number of units, rather than introducing numerous new devices. Cool air was directed into the safety passage (center), and existing fans were used to disperse the cool air from the center to implement heatstroke measures. Additionally, since the outdoor unit is in a snow-prone area, measures were taken to elevate the outdoor unit's position to protect it from snow falling from the roof. [Case Overview] ■ Installed Equipment: D.D-Multi (4 units) ■ Factory Size: 2,700 m² *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Company information
Fiska Corporation provides services focused on cost reduction and environmental considerations, primarily centered around heat pumps for house cultivation. Additionally, we offer meticulous support for environmental improvements and heatstroke countermeasures in factories, warehouses, gymnasiums, indoor pools, sports gyms, outdoor workspaces, theme parks, and event venues.