What are the reasons for the failure of system implementation? Four reasons for not making full use of it.
To avoid wasting system investments! What is the method to identify hidden causes and make the most of them?
Do you feel that the effects of implementing the system are not showing? The reasons for this often include excessive customization, lack of basic data, low awareness of utilization on-site, and issues with the system itself. To solve this problem, an "In-house System Reutilization Project" is essential. Consultants will objectively understand the issues and promote improvements aimed at overall optimization. *For detailed content of the column, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
For detailed information about the column, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For detailed information about the column, please download the PDF or feel free to contact us.
catalog(6)
Download All Catalogs

Company information
Our company was founded in 2001 and provides practical consulting to support improvement activities in the manufacturing industry, including revenue enhancement, productivity improvement, lead time reduction, and inventory reduction through the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create tailored original programs that address each company's specific management challenges, progressing from "on-site improvements" to "system improvements" and then to "production innovation," providing appropriate solutions. If you encounter any issues that need to be resolved, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astec Consulting HP] https://www.ast-c.co.jp/