[Case Study 1] Related to Architectural Hardware <Manufacturing Molds in a Short Delivery Time>
The industry is related to architectural hardware! A case where molds and prototypes were delivered one week later with a three-week lead time.
We would like to introduce a case study that addresses the challenge of "wanting to produce molds in a short delivery time" that we handled. We received a request for the production of a simple mold with a delivery time of three weeks, but after one week, we delivered the mold and prototype, which surprised the client with the response, "Is it already done?" Additionally, we have a track record of producing a progressive mold, which typically takes about a month, in approximately two weeks for a mold measuring (400×1200). [Case Overview] ■ Customer Industry: Construction Hardware ■ Inquiry: Request for mold production in a short delivery time ■ Achievements - A request for the production of a simple mold with a three-week delivery time, but we delivered the mold and prototype after one week. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Ueki Manufacturing Company is a company that engages in creative efforts to meet the needs of the times and our customers, working daily on mold production. With three machining centers and six wire-cutting machines, we can simultaneously process plates and punches, enabling us to provide short delivery times. We have a consistent production system in place, from quotations to design, assembly, and the provision of prototypes, all handled in-house.