The core "assembly" process of the TONE brand! Aiming to solve both "efficiency" and "cost" aspects.
We would like to introduce a case study on problem-solving at TONE Corporation, a comprehensive tool manufacturer dealing with bolt fastening equipment and torque management devices. After scrutinizing the functions of two locations, the headquarters factory and the manufacturing factory, it was decided to construct a new factory specialized in product planning, assembly, and distribution of TONE brand products. After construction, we received feedback stating, "The benefits of utilizing a three-dimensional automated warehouse exceeded our expectations." 【Case Overview】 ■Issue: Work efficiency ■Solution: ABC analysis + automated warehouse / visualization of cost-effectiveness ■Industry: Manufacturing ■Warehouse Type: Manufacturing factory (partially automated warehouse) ■Stored Items: Hand tools, power tools, machine parts *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Sanwa Construction Co., Ltd. is a company that develops a total solution brand for custom-made warehouses, embodying the desire to "provide the ideal (RISO) warehouse (SOKO) for our customers." Since its founding, we have handled many warehouse constructions. Special warehouse construction requires a high level of expertise, including extensive knowledge of various laws and negotiations with government authorities. We provide warehouses that meet our customers' exact specifications and contribute to their business development.


![[Case Study] Heiki Shipping Co., Ltd. <BCP Measures (Flooding and Power Outage)>](https://image.mono.ipros.com/public/product/image/c69/2001533171/IPROS1819784252838621531.png?w=280&h=280)
![[Case Study] Marukami Logistics Co., Ltd. Izumi Business Office <Work Efficiency>](https://image.mono.ipros.com/public/product/image/3ec/2001533172/IPROS6486511978984014458.png?w=280&h=280)
![[Case Study] Tochimoto Tenkaido Co., Ltd. <GMP Compliance>](https://image.mono.ipros.com/public/product/image/96a/2001533174/IPROS3008323407195363720.png?w=280&h=280)
![[Case Study] Banmi Holdings Co., Ltd. <Logistics Improvement>](https://image.mono.ipros.com/public/product/image/41e/2001533180/IPROS14653263445483826521.png?w=280&h=280)
![[Case Study] Tanabe Shoji Co., Ltd. Tokyo Bay Branch](https://image.mono.ipros.com/public/product/image/889/2001533184/IPROS4030542935587009064.png?w=280&h=280)
![[Automated Warehouse Implementation Case] Sumitomo Heavy Industries Ion Technology Co., Ltd.](https://image.mono.ipros.com/public/product/image/f43/2001489236/IPROS04671314682662193896.jpeg?w=280&h=280)
![[Free Brochure Available] Six Points for Reducing Automated Warehouse Operating Costs](https://image.mono.ipros.com/public/product/image/188/2000075303/IPROS60544989361640942243.jpeg?w=280&h=280)
![[Logistics System Improvement Case] Nikko Sangyo Transport Co., Ltd.](https://image.mono.ipros.com/public/product/image/2057304/IPROS17309702016037834858.png?w=280&h=280)

![[Automated Warehouse Case Study] Pisco Co., Ltd. Ina Second Factory](https://image.mono.ipros.com/public/product/image/50a/2001215458/IPROS45381662822425006328.jpeg?w=280&h=280)

