List of IT/Network products
- classification:IT/Network
9571~9585 item / All 42291 items
Presentation of explanatory materials on JIS and ISO standards. We propose suitable safety barriers from a rich product series! Free rental of demo kits.
- Other safety and hygiene products
You can download a free booklet that introduces the uses, structures, and examples of various types of frames.
- Other machine tools
- Solar power generator
- Other energy equipment
Solve the challenges of the manufacturing site and promote "DX"! Improve the utilization rate of resources (machinery, personnel, raw materials, tools, etc.).
- Production Scheduler
- Process Control System
Solve the problems of the manufacturing site and promote "DX"! Improve the utilization rate of resources (machinery, personnel, raw materials, tools, etc.).
- Production Scheduler
- Process Control System
A full-fledged domestic CRM cloud service that can be implemented at the departmental level of small and medium-sized enterprises as well as large corporations.
- SFA/Sales Support System
- Other information systems
- Other server related
Super-efficient production planning with AI! Achieve a 98% reduction in planning man-hours and a 100% on-time delivery rate with easy setup.
- Production Scheduler
[Case Study] Reducing setup time that varies by production order to increase the operating time of production equipment.
As a case study for the implementation of Optimal Works, we have published an example from a chemical manufacturer that focuses on "reducing setup time, which fluctuates based on manufacturing order, to increase the operating time of production equipment." In the manufacturing process of paints and dyes, there is a cleaning time for equipment (setup time). To increase production volume, it is necessary to create a production plan that minimizes setup time and maximizes equipment operating time. However, the know-how for planning has become tacit knowledge held by experienced personnel, leading to risks associated with reliance on specific individuals. The article introduces a case where the implementation method of Optimal Works, which involves checking outputs and improving production plans through PDCA (Plan-Do-Check-Act), has formalized the know-how and achieved a reduction in work time. Please take a look at the link below.
AI monitoring support sensor cameras standardly equipped for medical and welfare facilities - IT-based nurse call system.
- Other security and surveillance systems
- Other information systems
Automating complex production planning with optimization calculations in the cloud, achieving shorter lead times and improved productivity.
- Production Scheduler
Recommended PC for structural analysis (FEM) software "Simcenter 3D"
- Structural Analysis
- Other research software
- server
Solve the challenges of the manufacturing site and promote "DX"! Improve the utilization rate of resources (machinery, personnel, raw materials, tools, etc.).
- Production Scheduler
- Process Control System
Solve the challenges of the manufacturing site and promote "DX"! Improve the utilization rate of resources (machinery, personnel, raw materials, tools, etc.).
- Production Scheduler
- Process Control System
Break free from Excel management! Streamline equipment maintenance and achieve increased operational efficiency.
- Server monitoring and network management tools
Break free from Excel management! Digitize equipment maintenance information to improve operational efficiency!
- Server monitoring and network management tools
Break away from Excel management! Digitize equipment maintenance information and significantly improve operational efficiency!
- Server monitoring and network management tools
Break away from Excel management! Achieve efficiency in equipment maintenance.
- Server monitoring and network management tools
Break free from Excel management! Digitize equipment maintenance information and improve operational efficiency!
- Server monitoring and network management tools
Solve the problems at the manufacturing site and promote "DX"! Improve the utilization rate of resources (machinery, personnel, raw materials, tools, etc.).
- Production Scheduler
- Process Control System