List of crane products
- classification:crane
46~90 item / All 475 items
It is a compact, foldable design that can be used anytime and anywhere.
- crane
The arm can be adjusted in two stages (900mm and 1,100mm) with a lock pin, allowing it to reach deep areas and improve work efficiency.
- crane
It is possible to adjust the span in 11 stages according to the arrangement of pallets and suspended loads.
- crane
It is ideal for work sites without crane equipment.
- crane
It is ideal for lifting and moving in work sites without crane equipment.
- crane
The crane with a compact and lightweight U-shaped leg can rotate up to a maximum angle of 60°!
- crane
The arms and legs are foldable, making it compact and usable anytime and anywhere.
- crane
It is a compact, foldable design that can be used anytime, anywhere.
- crane
We will provide packaging guidance on-site to ensure it fits within the container size!
- crane
Processing large and heavy materials to create products on a grand scale that support society.
- Processing Contract
- crane
【Useful Weather Information】What is the "utilization coefficient" used in port construction?
- crane

What is the 'utilization coefficient' used in port construction for those involved in marine construction?
Thank you for always watching. This time, I will talk about important indicators used in port operations. Depending on the site environment, offshore construction is easily affected by waves and wind, so it is particularly necessary to carefully consider the weather in cost management and labor management. For this reason, there is an important keyword in offshore construction called "utilization coefficient." This time, we will take a rough look at this "utilization coefficient." 1. What does "utilization" mean? 2. Calculation of the utilization coefficient 3. Concept of the utilization coefficient 1. What does "utilization" mean? First, "utilization" refers to the state in which machinery and equipment have been delivered to the construction site. The number of days from when the equipment is delivered to when it is removed is called "utilization days." Additionally, the construction period (excluding preparation and cleanup) includes not only the days when work is performed (operating days) but also non-operating days (holidays, safety training days, days of inclement weather, etc.). The remaining number of days in a year (365 days) after excluding these non-operating days becomes the annual "operating days" for the machinery and equipment. *For more details, please visit our website or feel free to contact us.
[Weather Helpful Information] What kind of wind is an average wind speed of 10 m/s for work stoppage criteria?
- crane
Immediate reversal is possible even in narrow spaces! It can be used for long object canning operations and front-and-back reversal tasks in painting factories.
- crane
A set of pins for storing the arm crane hook and the lynch pin to secure it!
- crane
It is an essential item for lifting wires. It allows for correcting the "kinks" in lifting wires and performing safety checks.
- crane
Effective use of factory space! A transport device that runs on rails integrated with power supply lines! Equipped with a lifter function!
- crane
Smartly accommodates various order specifications! You can check its operation status at hand.
- crane
Remote operation in dangerous places with an explosive atmosphere! Simplification of on-site construction and reduction of time is possible.
- crane
Inverters and other devices are less susceptible to noise! A one-piece silicone cover is included as standard.
- crane