We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 484 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. 双和化学産業株式会社 Hyogo//others
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  3. Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  4. 4 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト
  5. 5 FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社

Construction method Product List

31~60 item / All 1407 items

Displayed results

The "Infrared Welding Machine Series" that changes plastic welding methods.

Heating only the resin welding area with unique infrared technology! Complete welding of 3D shapes without any damage! No resin adhesion with non-contact heating.

This is a welding technology that achieves high welding strength and a clean finish without any burrs in a short time through non-contact infrared heating. 【Features】 ■ Increases productivity and reliability of resin welding Since only the areas exposed to light can be melted without contact, there is no thermal impact on other areas, and no heater resin adhesion. ■ No damage to the interior of the workpiece By masking, infrared light is irradiated only on the welding line for melting, ensuring no thermal impact on components such as substrates, motors, or resin gears inside the resin workpiece. ■ No impact from welding burrs Since the welding area is completely melted, even if burrs appear on the surface, they do not fall off, resulting in a clean shape. Welding without producing burrs is also possible with a burr trap. ■ Complete airtight welding even for difficult-to-weld resin materials High melting point resin materials are completely melted before welding, achieving welding strength close to the base material strength and ensuring complete airtight welding. A wide range of welding conditions can be realized. ■ Minimal influence from warping or dimensional variations of the workpiece, allowing for 3D shape welding lines By adjusting the output of the infrared light separately for the melting areas, it is possible to uniformly melt the entire welding line at once and apply pressure, enabling melt replacement welding. ■ No restrictions on the color of the resin workpiece Complete welding is possible even with combinations of workpieces of different colors, such as transparent, white, and black.

  • ●大型 横型サーボ駆動 赤外線溶着装置.jpg
  • ●中型 縦型サーボ駆動 2連型 赤外線溶着装置 .jpg
  • ●中型 縦型サーボ駆動 汎用型 赤外線溶着装置.jpg
  • ●小型 縦型サーボ駆動 多点型 赤外線溶着装置.jpg
  • 例.jpg
  • Welding Machine
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Heatless Glass System "Civil Engineering Construction Method"

By combining the advantages of inorganic and organic materials, we create excellent coatings that achieve ultra-long-term protection!

This is an introduction to long-term maintenance coating methods for concrete structures, steel structures, and similar constructions. The "HLG System Civil Engineering Method" has systematized (methodized) the appropriate surface preparation and application methods to adhere a SiO2 bonded glass film as a topcoat to each target object, such as concrete and steel structures. We aim to develop a coating method suitable for the long-term preservation of public assets. 【Features】 ■ Barrier properties ■ Ultra-durability ■ Washable recovery ■ Non-combustibility ■ Low cost ■ Insect-repellent and antibacterial *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Free Inspection] Teratech Method to Fill Underfloor Cavities and Reduce Machine Vibration

Zero downtime for filling voids under the floor! The Teratec method reduces machine vibrations.

The machine, which should be firmly installed, has excessive vibrations despite regular adjustments. Leveling adjustments are needed repeatedly. It may be due to a hollow space under the floor. Machine vibrations negatively impact product quality and machine durability. Additionally, increased frequency of machine adjustments lowers work efficiency and poses various issues affecting employee health and safety. With the "Teratec Method," we can suppress machine vibrations without breaking the floor, moving the machines, or halting operations. If you are troubled by machine vibrations, please feel free to contact us. Toll-free number: 0120-873-835 [Examples of concerns regarding machine vibrations] - The operating noise of the machine has increased. - The machine shakes every time a forklift passes by. - Repeated leveling adjustments are being made to the machine. - Vibrations are causing inaccuracies in laser processing machines and inspection equipment. - Product defects are occurring due to machine vibrations. - Vibrations are affecting the health of on-site workers. - The machine's maintenance sensors are not measuring correctly due to vibrations. ★ We also accept inquiries from Asian countries such as Thailand, Vietnam, and Indonesia.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Subsidance Correction" - Watch the "TerraTech Method" in a video.

Correcting floor subsidence caused by ground subsidence without stopping operations. "Subsidence correction and void filling" without dismantling the floor.

The "Teratech Method" is a construction technique that corrects the tilt, subsidence, and unevenness of concrete floors in factories, warehouses, stores, and shopping centers by injecting a special urethane resin called "Teratech Resin," without damaging the floor or halting operations. **Features of the Teratech Method:** - Injection holes smaller than a one-yen coin, with a diameter of 6 mm. There is no need to break the floor. - Specialized technicians perform corrections while measuring in millimeters. - Minimum load-bearing capacity of 19 tons per square meter. - Weighs approximately 10 kg per cubic meter, making it lightweight. *This is 1/20th the weight of concrete. - Short curing time of about 30 minutes, allowing large trucks to pass immediately after construction. - Standard daily construction area is 200 square meters (this may vary depending on construction conditions). Available nationwide in Japan. Construction achievements: Over 300 cases annually from Hokkaido to Okinawa. Total construction area: Over 1,177,000 square meters. We can handle projects ranging from 30 square meters to several thousand square meters for factories, warehouses, shopping centers, and more. Available nationwide in Japan, 24/7, feel free to consult us! Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Unevenness Correction" Correction of uneven concrete floors "TerraTech Method

We will quickly fix the "wobbling" and "unevenness" at the floor joints caused by the hollow space under the floor without damaging it!

Unevenness and bumps in the concrete floor that hinder the smooth operation of forklifts. Every time the forks pass, it rattles, causing damage to the cargo, items to fall from the forks, and requiring a reduction in speed, which significantly decreases work efficiency, doesn't it? Not only does the decline in work efficiency pose a problem, but it also presents numerous safety hazards for employees. With the "Teratec Method," we can eliminate the unevenness and bumps in the concrete floor without breaking it and without halting operations, all in a short time. Since we do not break the floor, there is almost no noise, debris, or dust generated. We offer services 24 hours a day, 365 days a year, including weekends and holidays! For adjustments to the unevenness and bumps in concrete floors in factories, warehouses, cold storage facilities, and distribution centers, please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement Correction and Void Filling: TerraTech Method Case Study Collection Giveaway

Over 4,500 construction projects! With the extension of the lifespan of structures being considered now, the number of projects in factories, warehouses, and stores is rapidly increasing!

The Teratech method quickly corrects the tilting, sagging, distortion, and unevenness of floor slabs in factories, warehouses, stores, and shopping centers caused by ground subsidence by injecting a special urethane resin called "Teratech resin." ◆ Teratech Method * A cavity survey under the floor is conducted in advance. 1. Measure the tilt of the floor. 2. Drill holes with a diameter of 6 millimeters, smaller than a one-yen coin, at the correction points. 3. Use proprietary equipment to inject resin under the floor slab. 4. The injected resin begins to expand instantly. This expansion force compacts and strengthens the ground while pushing the floor upward. 5. Correct the floor while measuring its movement in millimeters. 【Features】 ■ Lifts from underneath the floor, so no damage to the floor. ■ Short construction period; can level an area of 200 square meters in one day. ■ Cost-effective compared to demolition and restoration work. ■ No demolition work means it is quiet and produces no waste. ■ Does not use water, so it does not dirty products or machinery. By addressing floor subsidence, tilting, and cavity filling, we can ensure the safety of workers and customers, improve work efficiency, and enhance the internal environment, leading to better business performance. Please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Ground Improvement" "GSIS Method" Ground improvement directly beneath the building.

Efficient ground reinforcement with minimal loss! Ideal for land with existing buildings.

The "GSIS Method" is suitable for ground reinforcement in areas where buildings already exist, as it does not involve excavation work and has minimal impact on adjacent structures. Based on meticulous survey results, the method allows for direct injection of agents into weak ground layers, enabling efficient ground reinforcement with minimal loss. [Features] - Ideal for ground improvement beneath existing buildings - No excavation work, resulting in minimal impact on adjacent structures *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • GSIS2.png
  • GSIS3.png
  • Other contract services
  • Machinery and equipment installation/dismantling/relocation
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: School

Solving problems at school! Introducing "TerraTech" construction examples for settlement correction and void filling.

We would like to introduce a case where we solved problems caused by subsidence and voids at a school using the Teratec method. 【Problem】 We received a consultation from a junior high school in Yamagata Prefecture stating, "The classroom floor is sagging, and the desks are wobbling." Upon investigation, it was confirmed that voids were present under the floors in six classrooms due to long-term ground subsidence. 【Reason for Choosing Teratec】 It was believed that the methods to address ground subsidence of concrete floors were either to redo the flooring or to apply a topping and adjust the level. However, considering the time required for moving, demolition work, and the curing period after concrete pouring, it was determined that the construction would take more than a month, making it difficult to complete during the summer vacation. Therefore, the Teratec method was adopted. 【Feedback After Construction】 By utilizing the summer vacation period to implement this method, we were able to completely eliminate the wobbling of desks and chairs. *For more details, please visit the external link page or feel free to contact us. https://teretek.jp/plus/case/school Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Teratec Construction Report: Airport

Elimination of flutter and voids in airport aprons (parking areas)! Introducing TerraTech construction case studies.

We would like to introduce a case where the issues of subsidence and cavities at the airport were resolved using the Teratec method. The "Teratec method" is a technique that corrects "steps," "tilts," and "subsidence" that occur in the concrete floors of airport aprons (parking areas), hangars, and concrete paved taxiways, without stopping operations for a short period of time. 【Issues】 At the airport apron, subsidence and warping occurred, leading to changes in the water gradient, which resulted in the formation of puddles in some areas, creating a dangerous situation. 【Reasons for Choosing Teratec】 - Repairs can be made while measuring in millimeters in a short time. - The construction is completed quickly. 【Feedback After Construction】 We received feedback stating, "It was good that the cavities were filled at the same time, considering safety in operations." *For more details, please refer to the external link page or feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor sinking correction, void filling under the floor, and building tilt correction work in Asian countries.

We accept inquiries about floor sinking correction, void filling under the floor, and building tilt correction work in Asian countries such as Thailand, Vietnam, and Indonesia.

We provide technical support for construction work such as settlement correction at overseas factories of Japanese corporations. Our Japanese staff will assist you from investigation and construction planning to construction management, ensuring that the quality of construction is the same as in Japan. For more details, please contact us by phone. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 2 Manufacturing Factory "TerraTech Method"

Introducing a discussion with Akebono Industries, who conducted a floor deflection reduction project using the Teratec method.

In July 2016, we spoke with Mr. Tatsuya Abe, the President, and Mr. Kiyotaka Abe, the Executive Vice President of Akebono Sangyo Co., Ltd., who conducted a floor deflection reduction project at their factory using our "Teratech Method." The company is headquartered in Minamisenju, Arakawa Ward, Tokyo, and has its first and second factories in Noda City, Chiba Prefecture. They primarily manufacture rubber mats and carpets for automobiles and are expanding their business into the production of industrial materials. This document includes information on the situation before construction, the issues faced, and the reasons for choosing our company. [Contents] - Situation before construction and the trigger for the inquiry - Reasons for choosing our company - Issues caused by floor deflection - Information about our construction work *You can download materials that include customer feedback. *For more details, please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 3 Refrigerated Warehouse "Teratec Method"

Introducing a conversation with Ichiyou regarding the floor sinking correction work using the Teratec method.

In September 2017, we spoke with Mr. Toshio Baba, Vice President of Oriichi Co., Ltd., who conducted floor sinking correction work for a refrigerated and frozen warehouse using the "Terra Tech Method." The company was founded in 1953 in Imaichi City, Tochigi Prefecture, with the aim of manufacturing and selling wooden folding boxes and paper containers. Since then, it has expanded its business to include cardboard manufacturing, corrugated production, a weight bag system division, a packaging division, a packaging materials and equipment division, and the refrigerated warehouse and frozen transportation division that we worked on this time. This document includes information about the situation before construction, the reasons for choosing our company, and details about the construction work. [Contents] ■ Situation before construction and the trigger for the inquiry ■ Reasons for choosing our company ■ I was surprised by the beauty of the finish ■ Space efficiency is important for refrigerated warehouses ■ Details about our construction work * You can download materials that include customer feedback. * For more details, please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 1: Warehouse "Teratec Method"

Introducing a discussion with Chuo Packing Transport, who performed subsidence correction of a warehouse using the TerraTech method.

In February 2017, we spoke with Mr. Yoshinori Shitaira, Executive Director of Chuo Packing Transport Co., Ltd., about the floor sinking correction work carried out in their warehouse using the "TerraTech Method." Chuo Packing Transport Co., Ltd., headquartered in Suginami Ward, Tokyo, is a transportation, warehousing, and recycling company. Founded in 1969, it has contributed to the development of the Japanese economy through office relocations for corporations, seasonal product storage/management, document storage services, PC kitting services, and logistics. This document includes information on the situation before construction, reasons for choosing our company, and details about the work performed. [Contents] ■ Situation before construction and the trigger for the inquiry ■ Reasons for choosing the TerraTech Method ■ Reasons for choosing our company ■ Impressions after construction *You can download materials containing customer feedback. *For more details, please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Customer Feedback Vol. 4: Rental Space "Teratec Method"

Introducing a conversation with the manager who conducted a floor deflection reduction project using the Teratec method.

In August 2018, we spoke with a customer who had construction work done to reduce the deflection of the concrete floor in their rental space using our "Teratech Method." The first floor of a building constructed in 1961 is operated as a rental space, and the customer requested the floor modification because they wanted to preserve the charm of the old building. This document includes information about the reasons for the request and the performance of the construction staff. [Contents] ■ The reason for contacting our company ■ Information about the historically significant building completed in 1961, located near Shibuya Station ■ Performance of the staff * You can download a document containing customer feedback. * For more details, please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The first step in warehouse automation is the "Terra Tech Method" from the level of the floor.

Currently, with the advancement of delivery management and warehouse automation utilizing AI and big data, the levelness of the facility's floor is an important theme for the introduction of automation equipment.

If the floor is not level... ☑ The installation of high-rise racks will require liner support, causing anxiety! ☑ There is a possibility that high-pick operators may fall, making it unusable! ☑ There may be obstacles to the operation of AGVs (automated guided vehicles)! ☑ High stacking of pallets and nestainers may become tilted and impossible! The "TerraTech Method" levels the floor's tilt and subsidence in a short construction period. ◆ What is the TerraTech Method? Is your warehouse's concrete floor tilted or sunken? The TerraTech Method involves injecting TerraTech resin beneath the concrete floor, using its expansion force to return the sunken floor to level and fill any voids underneath. This patented method corrects the "tilt," "sinking," "steps," and "deflection" of the concrete floor without damaging it, and does so in a short period. Please feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correction of floor tilt and subsidence with zero downtime! "Teratec Method"

No noise and night construction is possible! We will correct the floor's tilt and subsidence with "zero" downtime!

The "Teratec Method" restores the deflection and distortion of concrete floors to a level surface within a day without stopping operations. Unlike conventional methods, there is no need to move equipment or materials. Corrections can be made without breaking the floor and without halting operations. Additionally, we have over 300 construction achievements annually in various facilities, including metal processing factories, logistics warehouses, food factories, offices, machinery manufacturing plants, supermarkets, material warehouses, condominiums, residential equipment manufacturing plants, and precision machinery factories. 【Features】 ■ Does not stop site operations ■ 4,200 construction achievements ■ Available nationwide 24/7, 365 days a year ■ Patent method ■ 10-year warranty for peace of mind ■ Maximum warranty construction limit of 50 million yen *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pest Control: The 'TerraTech Method' fills habitats and entry points with resin.

Leave pest control and foreign matter intrusion prevention for factories and warehouses to us! We will fill the gaps and shut out intrusions!

The "Teratec Method" is a technique for filling voids under floors that have developed over time with Teratec resin. The voids under the floor created by aging deterioration become ideal hiding places for insects. Harmful organisms breed using the dirty water from cleaning the floors as a nutrient source, and they invade the facility through cracks and routes where contaminated water flows in. This method not only eliminates the entry points and habitats for pests by filling the voids under the floor, but it also reduces the risk of insect emergence from beneath the floor. Furthermore, it can be implemented at night, allowing the factory to operate from the morning. 【Features】 ■ Fills habitats and blocks entry points ■ Long-term pest control ■ Can be implemented without stopping operations ■ Nationwide construction support 24 hours a day, 365 days a year *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Numerous achievements in public works! Settlement floor correction method 'Teratec Method'

Teratec method: It's not just about replacement and resurfacing! A floor repair method!

【Numerous achievements with the Ministry of Land, Infrastructure, Transport and Tourism and various local governments】 Quickly and fundamentally resolve issues such as floor tilting, unevenness in public facilities, and voids under roads. Are you still considering just replacement or resurfacing? The Teratec method is chosen for public works as well as warehouses, factories, and stores, with a track record of 4,200 projects! ▼ What is the Teratec method? The "Teratec method" is a patented technique that injects Teratec resin under concrete floors to fill voids caused by sinking, restoring the floor to a level position using the resin's expansion force. "Using the expansion force of Teratec resin, we lift and level sinking or tilted floors." This innovative idea has made it possible to restore floors to a level position quickly without destruction. 【Features of the Teratec method】 - No. 1 market share in Japan* (4,200 construction achievements) - Available for construction 24 hours a day, 365 days a year - Reliable technology with patented and former NETIS registration (QS-080007) * (Market share for sinking correction work using urethane injection method / based on our research) ▶ For more details, please view the catalog from "PDF Download." Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Are you only considering redoing and repainting?" A method with overwhelmingly short construction time.

Short construction period! No damage to the floor! No interruption to operations! Available 24/7 throughout Japan.

"I replaced it six months ago. If I had known about this method earlier." This is a voice from our customers that we hear at exhibitions and other events. 【What is the Teratech Method?】 Unlike traditional methods of replacement or resurfacing, this method restores floor slopes, subsidence, and unevenness to a level surface without breaking the floor and without stopping operations. It is a patented method that injects Teratech resin beneath concrete floors (roads) to fill voids under the floor with its expanding force, bringing the sunken floor back to level. Since it uses injection holes smaller than a one-yen coin (6mm) to inject expanding resin without breaking the floor, there is no need to remove goods or machinery. This means there are no additional costs for moving items, temporary storage during construction, or disposal of industrial waste, aside from the construction costs. 【Main Features】 1: Can be constructed without stopping operations 2: Short construction period (150 to 200 square meters in about 8 hours) 3: No need to move goods, racks, or machinery since the floor is not broken 4: Normal use is possible immediately after construction For more details, please view the catalog from the "PDF Download" section. Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polyurethane injection "Teratec method" for addressing floor tilt, subsidence, step differences, and voids.

If you're troubled by floor tilting, sinking, unevenness, or voids! With construction that doesn't damage the floor, we won't stop operations and will provide an overwhelmingly short construction period!

●What is the Teratech Method... It is a patented method that injects rigid polyurethane foam "Teratech resin" under concrete floors, filling voids beneath the floor with its expansion force and leveling sunken floors. Since it does not damage the floor, there is no need to move shelves or machinery, allowing operations to continue without interruption! ▼Various issues we have resolved 【Tilt】 - Struggling with uneven factory floors. I want to make the concrete floor flat. - The warehouse floor has a gentle slope, causing automatic racks to misalign and malfunction. - The area where machinery is installed has sunk, resulting in tilting of the machinery. 【Settlement】 - The concrete floor is sinking towards the center. - The gymnasium floor at the school is sinking except for the underground beams. - There are depressions on the warehouse floor, raising concerns about product storage and worker safety. 【Step Differences】 - Struggling with floor step differences and tilts. I have repaired it with additional concrete but want a fundamental solution. - There is a step at the entrance of the refrigerated warehouse, making it difficult for forklifts to pass. 【Hollows and Gaps】 - The vibration of the machinery has worsened. I would like you to check for any voids. - There are cracks in the floor where trucks drive. I am concerned about the possibility of voids beneath the floor. - Due to flooding, the soil beneath the floor has been washed away, creating voids.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Ground Improvement] "Permeation Solidification Injection Method" Ground improvement under buildings.

Injecting chemical solution to a depth of 20m! Permanent ground improvement: Chemical injection method (suspension and solution type)

"Permeation Solidification Injection Method" This is a permanent chemical injection method that selects injection materials and methods based on ground information to strengthen the ground and prevent water infiltration. It uses durable grout materials to permeate a wide area for ground improvement. 【Features】 ■ Permanent ground improvement ■ Allows for significant reduction in the number of injections, as it can permeate the agent over a wide area at low pressure from a large injection source ■ No surface uplift occurs after injection ■ No excavation work is required, thus no impact on adjacent structures ■ Minimal sludge discharge *For more details, please refer to the PDF materials or feel free to contact us. Toll-free number: 0120-873-835

  • Other contract services
  • Machinery and equipment installation/dismantling/relocation
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【REFLECTIX Customer Feedback】Heat Insulation Wire Method for Rental Factories

Introducing a case where the environment has become very easy to work in, with cool summers and warm winters!

We would like to introduce a case where the thermal insulation material "REFLECTIX" was adopted in a rental factory located in Higashi-Osaka City, Osaka Prefecture. The factory has a high ceiling, and although there was a desire to install air conditioning in the workspace, the building is old. Therefore, our product was used as ceiling material to create approximately 100 tsubo (about 330 square meters) of workspace within the factory. After the installation, we received feedback stating, "The working environment has improved significantly, and we now have a space where the air conditioning works well. I believe it was also good in terms of cost." 【Case Overview】 - Since the factory is a rental warehouse, a workspace was secured with steel frames inside the factory, and our product was installed on the ceiling. - A wire method was developed and implemented to ensure the product was installed without wrinkles for better workability. *For more details, please download the PDF or feel free to contact us.

  • Heat shielding film
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

リフレクティックス遮熱カバー工法<WBGT値の低減に>

熱中症対策の義務化に対応。日射と輻射熱を反射し、労働環境を改善。空調負荷を抑えて節電にも貢献

当社が提供する『リフレクティックス遮熱カバー工法』は、 高反射性能をもつ遮熱材を建物の屋根面などに取り付けることで、 作業空間内のWBGT値を効果的に低減し、熱中症対策に貢献します。 日射・輻射熱を高い水準で反射し、温度上昇を抑えることで空調負荷を軽減。 温度上昇を抑えることで空調負荷を軽減し、省エネ効果も期待できます。 【特長】 ■日射・輻射熱を効果的に反射する高遮熱材を使用 ■冷房なしでWBGT値28℃未満を実現した実績あり ■空調機器の使用負荷を低減し、省エネ化にも貢献 ■熱中症対策の義務化対応に向けた取り組みに活用可能 ※詳しくは資料をご覧ください。お問い合わせもお気軽にどうぞ。

  • Heat shielding film
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Melt Core/Visualization Model: Advantages of Vacuum Casting Method

Make the impossible possible! Reproduce product shapes with undercuts using casting methods! Utilize the characteristics of cast products to create a visual model of integration!

"Vacuum casting" is widely known as a method for creating plastic prototypes without the need for expensive and time-consuming mold creation. For shapes that have undercuts, which are typically produced in mass production using blow molding or DSI methods, expensive molds were created even at the prototype stage to obtain prototypes, as the vacuum casting method could not accommodate such shapes. In the melt core vacuum casting project for manufacturing air intake ducts, we aim to achieve both short lead times and low costs by reproducing shapes that were previously impossible with "vacuum casting." **Features** - Prototypes can be produced with uniform wall thickness and precision for complexly curved pipes, intake boots, duct systems, and bellows shapes. - Depending on the shape, production in rigid materials is possible, as well as integrated products of soft and rigid materials. - It is suitable for creating visualization models of various mechanical components. For verification tests in flow analysis, it is possible to produce integrated castings of internal undercut flow areas using a special melt core method. This is particularly useful for visualizing transmission components to aid in the development of oil flow analysis. For more details, please contact us or download the catalog.

  • Other molds
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Acidic soil amendment pH Balance S

A neutralizing agent for acidic soil that does not cause alkaline damage.

The soil on slopes and other areas targeted for greening projects is often severely lacking in nutrients and soil microorganisms, making it unsuitable for plant growth and not "fertile soil." In particular, in the case of supportive soils, necessary bases in the soil can be leached away by acids, leading to deficiencies, and the number of effective soil microorganisms drastically decreases. pH Balance S contains organic materials such as polysaccharides and proteins, which promote the explosive growth of soil microorganisms. The relationship between soil and soil microorganisms is essential for plant growth and "soil creation," as the aggregation of soil, nutrient supply, and organic matter supply are all functions of the soil.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wall greening system - Hedera climbing system

A wall greening system using climbing plants, boasting an adoption record of approximately 300,000 m²!

In cities covered by artificial structures, wall surfaces are also an important greening space. Vertical greening is attracting attention because it is easier to secure space and facilitate greening compared to rooftop greening. Additionally, in urban municipalities, wall surfaces are increasingly recognized as greening areas, enhancing their status as green spaces. The Hedera Vertical Greening System was developed and improved based on extensive achievements and experience to address the challenges of vertical greening, such as "early coverage," "low maintenance," and "durability." For more details, please contact us or refer to the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid plants: Easy greening with evergreen giraffe grass bag method.

The growth temperature ranges from -30 degrees to +40 degrees, and it can grow under any conditions throughout Japan.

The Evergreen Kiri Grass Bag Method (FTM Bag) is a new greening method that incorporates evergreen Kiri grass soil into bags, achieving "soil flow prevention," "weed control," and "easy greening." The standard size is 50 cm square, and with a weight of 4 kg per cubic meter, it is lightweight and used in various locations. For wall greening and folded plate roof greening, a size of 20 cm x 100 cm is used. Since the bags do not have a fixed shape, custom dimensions can be ordered to fit the site. For more details, please contact us or refer to the catalog.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flower and garden fertilizer "Birdie Large"

Fertilizer that creates greenery and nurtures flowers.

Bardirage can be widely used for flowering trees, garden trees, and flowers, ranging from large users such as municipal park greening and flower producers to home gardening. It contains 80% slow-release IB nitrogen and is a large particle fertilizer of 5-10mm, providing a long-lasting fertilization effect (70-80 days), making it an economical fertilizer for flowering trees, gardening, and slope greening that can be used with confidence. 【Features】 ○ Fertilizer for flowering trees and gardening ○ Contains 80% slow-release IB nitrogen, providing long-lasting fertilization and economical benefits ○ Large particle fertilizer of 5-10mm For more details, please contact us or download the catalog.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greenery Construction 'Cricote Series'

Prevent rapid erosion caused by rainfall and protect plant growth! A lineup that can accommodate a variety of greening methods.

The "Kuri Coat Series" for greening construction is a chemical that excels in workability, allowing for the stabilization of the vegetation base in a short period of time. The formed mesh-like solidified layer suppresses the evaporation of soil moisture while retaining the functions of water retention, moisture preservation, and aeration necessary for seed germination and growth. We offer a wide range of spraying chemicals, such as anti-drip agents, adhesives, granulation agents, and water retention agents, tailored to different construction conditions and methods, including spraying on steep slopes. 【Features】 ■ The solidified layer is strong and maintains its function as a vegetation base over the long term. ■ It has low viscosity, allowing for smooth dissolution and spraying during use, which can shorten work time. ■ It does not adversely affect plant germination and growth. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slope Erosion Prevention Agent "Kuri Coat C-710"

Forms a cohesive layer rich in water retention and air permeability, preventing erosion caused by rainfall. Low viscosity also improves work efficiency.

The "Kuri Coat C-710" is an erosion control agent that forms a solid layer rich in water retention and air permeability by quickly bonding with soil particles after application, thereby stabilizing the topsoil and preventing erosion caused by rainfall. Due to its low viscosity, the liquid product allows for smooth dissolution and spraying at the construction site, significantly reducing work time. The bonded layer is highly flexible and meets the necessary conditions for plant germination and growth, such as durability, water retention, moisture retention, and air permeability. 【Features】 ■ Resistant to rainfall ■ Low viscosity significantly improves work efficiency ■ Provides a sustainable foundation that protects germination and growth *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Other consumables
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration