We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 42 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  3. スワロー工業 Niigata//Building materials, supplies and fixtures
  4. 4 コスモシステム Tokyo//Industrial Machinery
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  4. 4 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  5. 5 リフレクティックス遮熱カバー工法<WBGT値の低減に> 佐武 東京支店

Construction method Product List

1291~1305 item / All 1395 items

Displayed results

[Construction Case] Precision Machinery Factory: Floor Slab Settlement Correction Work

A case of correcting the subsidence, gaps, and voids under the factory's earthen floor in just two days during the factory's holiday!

We would like to introduce a case of "floor slab settlement correction work" and "void filling work under the floor slab" carried out at a precision machinery factory in Kagoshima Prefecture. There were voids and cavities of about 30 to 40 mm under the factory's floor slab, and due to the settlement of the floor along with the columnar improvements, a correction request was made to Upcon. The construction was completed over two days during the factory's holiday weekend. After the work was finished, we received a thank-you email from the customer stating, "It was successfully lifted, and we were moved." 【Case Overview】 ■ Construction Area: Approximately 480 m² ■ Maximum Settlement Amount: 41 mm ■ Maximum Void Amount: 35 mm ■ Area: Kagoshima Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Precision Parts Factory: Floor Slab Settlement Correction Work

Settlement of up to 50mm in the concrete floor! A case where the existing concrete floor was corrected in one day without breaking it.

We would like to introduce a case of "floor sinking correction work" conducted at a precision parts factory located in Shizuoka Prefecture. The factory's floor had sunk by a maximum of 50mm, with a correction area of approximately 81m2. The construction period was one day. The injection work was carried out while checking the height with a laser level, and after the resin injection, the filling confirmation was performed using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 81m2 ■ Maximum Sinking Amount: 50mm ■ Area: Shizuoka Prefecture ■ Construction Period: 1 Day *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Parts Assembly Factory: Floor Slab Settlement Correction Work

Due to the sinking of the floor, work was hindered! Here is an example of a case where corrections were made in a short period without stopping operations.

Here is an example of "floor sinking correction work" carried out at a parts assembly factory in Fukuoka Prefecture. Due to the sinking, the floor was slanted, making it difficult to adjust the jacks during conveyor assembly. As a result of the work, we were able to improve the situation to the point where assembly operations could be carried out smoothly. 【Case Overview】 ■Issue - The floor was slanted due to sinking, making it difficult to adjust the jacks during conveyor assembly. ■Result - The situation was improved to the point where assembly operations could be carried out smoothly. *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Food Factory 2nd Floor: Settlement Correction Work and Unevenness Correction Work

Correction of unevenness and settlement on a floor with a special structure! Resolving issues with cart operations caused by unevenness.

We would like to introduce a case of "settlement correction work and unevenness correction work" carried out on the second-floor slab of a food factory located in Kanagawa Prefecture. Unevenness occurred in the floor panels of the refrigerated room, causing issues with the movement of carts transporting goods, and the panels were being held down with anchors to suppress the unevenness. After the construction, the settlement in front of the entrance was resolved, and the floor panels' floating issue was also eliminated by filling the urethane layer with new urethane. 【Case Overview】 ■ Construction Area: 46.17m² ■ Maximum Settlement Amount: 42mm ■ Void Amount: 46.17 ■ Area: Kanagawa Prefecture ■ Construction Period: 4 days (including ancillary work) *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Logistics Center: Outdoor Concrete Floor Settlement Correction / Underfloor Void Filling Work

Correction of the deflection in the slope section! A case where it was possible to adjust to a straight slope without any discomfort.

We would like to introduce a case of "outdoor floor subsidence correction" and "underfloor void filling work" carried out at a logistics center in Okayama Prefecture. The sloped area at the entrance of the building was sagging due to ground subsidence, so we adopted the Upcon method, which allows for quick correction of the sagging to avoid disrupting normal operations. After construction, we were able to almost eliminate the central sagging area and correct it to a straight slope without any discomfort. 【Case Overview】 ■ Construction Area: Approximately 410m2 ■ Maximum Subsidence: 93mm ■ Maximum Void: 150mm ■ Area: Logistics center located in Okayama Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Distribution Station: Floor Slab Settlement Correction / Underfloor Void Filling Work

Due to the extensive area of the modifications, the construction was carried out in several phases!

We would like to introduce a case of "floor sinking correction" and "underfloor void filling work" carried out at a distribution station of a product manufacturer located in Niigata Prefecture. Due to consolidation settlement, various areas within the station showed signs of sinking and sagging, prompting the adoption of the Upcon method, which allows for quick corrections. Since the area requiring correction was extensive, we utilized weekends during business shutdowns to divide the construction period and carry out the work. [Case Overview] ■ Construction Area: Approximately 1,460m2 ■ Maximum Settlement: 103mm ■ Maximum Void: 90mm ■ Area: Distribution station of a product manufacturer in Niigata Prefecture ■ Construction Period: 8 working days (Note: Construction was carried out in several phases) *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Large Product Storage Warehouse: Floor Slab Settlement Correction Work / Construction in 2010

Adopting the up-con method for short-term intensive repairs! Construction carried out to accommodate multiple plant vehicles.

We would like to introduce a case of "floor sinking correction work" conducted at a large product storage warehouse in Ibaraki Prefecture. Due to ground subsidence, the stacked cardboard boxes were leaning. For concentrated repairs over a short period, the Upcon method was adopted, and our company carried out the work with multiple plant vehicles. 【Case Overview】 ■ Construction Area: Approximately 2,000m2 ■ Maximum Subsidence: 110mm ■ Area: Large product storage warehouse in Ibaraki Prefecture ■ Construction Period: 6 days (Day 1: 4 vehicles, Days 2-6: 2 vehicles for construction) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Construction without moving the rack: Warehouse subsidence correction (Fukushima Prefecture)

No need to remove heavy racks or machinery! Here’s an example of a case that was corrected in just 4 days.

We would like to introduce a case of settlement correction implemented at a warehouse located in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake that occurred in 2011, gradual settlement progressed over the years, leading to the onset of floor sagging and tilting inside the warehouse. Inclination also developed in the areas where racks were installed. This caused issues such as the forklift forks not fitting properly, resulting in "longer loading and unloading times," which disrupted operations and caused difficulties. For this construction project, we adopted the Upcon method, which allows for construction without moving heavy racks within a short construction period. We were able to correct an area of approximately 1250m2 in just 4 days (with a maximum settlement amount of approximately 78mm). 【Case Overview】 ■ Construction Area: Approximately 1250m2 ■ Maximum Settlement Amount: 78mm ■ Location: Warehouse in Fukushima Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Supermarket: Floor Deflection Correction / Settlement Correction Work

Correction during nighttime while business is suspended! A case of correcting floor sagging due to ground subsidence in a short construction period.

We would like to introduce a case of "floor deflection correction" and "settlement correction work" carried out at a certain supermarket in Ibaraki Prefecture. The customer in this case was troubled by the floor inside the store being deflected due to settlement. Using the Upcon method, the work was conducted only at night, with minimal impact on business. The work was completed in a short period of two days without closing the store. 【Case Overview】 ■ Construction Area: Approximately 450m2 ■ Maximum Settlement Amount: Approximately 83mm ■ Area: Ibaraki Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Game Center: Earthquake Recovery Work / Floor Slab Settlement Correction Work

Due to the impact of the China-Vietnam earthquake, part of the floor inside the store has sunk! Case study of sinking correction work at a game center.

We would like to introduce a case where "disaster recovery construction" and "floor sinking correction work" were carried out at a game center located along a national highway in Niigata Prefecture. In this case, part of the floor inside the store sank due to the effects of the Chuetsu earthquake. As it was possible to correct the sinking in a short period, our company was requested to perform the sinking correction. The sinking was corrected using the Upcon method with rigid polyurethane foam. The construction was completed in one day. 【Case Overview】 ■ Area of sinking correction: Approximately 83m2 ■ Maximum sinking amount: -77mm ■ Planned correction value: Within 16mm ■ Area: Niigata Prefecture ■ Construction period: 1 day *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Drugstore: Settlement Repair Work (Niigata Prefecture)

Floor sagging due to ground subsidence! A case of straightening the floor before store renovation.

Here is a case study of "settlement correction work" conducted at a drugstore in Niigata Prefecture. In this case, the store's floor had sagged due to settlement. At the time of the store renovation, they wanted to correct the floor to make it level, and our Upcon method was adopted. The construction area was approximately 1500m2. Using the concrete replacement method, a project that typically takes one month was completed in just four days. (Settlement amount approximately 100mm) 【Case Overview】 ■ Construction Area: Approximately 1500m2 ■ Maximum Settlement Amount: Approximately 100mm ■ Area: Drugstore in Niigata Prefecture ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Toy Retail Store / Electronics Retail Store: Earthquake Recovery / Floor Settlement Correction Work

Due to the impact of the Great East Japan Earthquake, the floor inside the store has significantly sunk! There have been cases where gaps have formed between the floor and the walls, as well as between the walls and the ceiling.

We would like to introduce a case of "earthquake recovery construction" and "floor subsidence correction work" carried out at a toy retail store and an electronics retail store in Fukushima Prefecture. Due to the impact of the Great East Japan Earthquake, the floor inside the toy retail store sank significantly. As a result of the floor subsidence, gaps were observed between the floor and walls, as well as between the walls and ceiling. Therefore, an up-con method that can be corrected during the night while the store is closed was adopted, and our company carried out the correction work. Additionally, since there were voids under the floor, we also implemented void filling work by injecting polyurethane resin into the gaps. 【Case Overview】 ■ Construction Area: Approximately 2,300m2 ■ Maximum Subsidence: 144mm ■ Area: Fukushima Prefecture ■ Construction Period: Continuous 11 nights (2012) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center: Subfloor Settlement Correction Work

Due to consolidation settlement, the floor has sunk over a wide area inside the store! A gap has occurred between the floor and the wall.

We would like to introduce a case of "subfloor sinking correction work" and "subfloor void filling work" carried out at a shopping center in Iwate Prefecture. Due to consolidation settlement, sinking was observed over a wide area of the floor. As a result of the floor sinking, gaps appeared between the floor and walls, causing various issues throughout the store. An Upcon method that could be corrected during the night while the store was closed was adopted, and our company performed the corrections. Additionally, since voids and cavities were also observed under the floor, void filling work using urethane was carried out as well. [Case Overview] ■ Construction Area: Approximately 540m² ■ Maximum Settlement Amount: 71mm ■ Maximum Void Amount: 190mm ■ Area: Iwate Prefecture ■ Construction Period: Continuous 7 nights *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Supermarket: Subfloor Settlement Correction Work (Gifu Prefecture)

Floor subsidence due to weak ground! Introducing a case where repairs were made during nighttime while the business was closed.

We would like to introduce a case of "subfloor sinking correction work" carried out at a large supermarket located in Gifu Prefecture. A large portion of the backroom and store interior had sunk, causing gaps to appear between the floor and walls due to the floor sinking, resulting in various issues throughout the store. An Upcon method that can be corrected during the night while the store is closed was adopted, and our company performed the corrections. 【Case Overview】 ■ Construction Area: Approximately 700m2 ■ Maximum Sinking Amount: 85mm ■ Area: Gifu Prefecture ■ Construction Period: Continuous 5 nights (2013) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)

Due to the impact of the Great East Japan Earthquake, subsidence occurred! Adjustments of 350m2 were made over four consecutive nights of construction.

Here is a case study of "subfloor sinking correction work" conducted at a leisure facility in Ibaraki Prefecture. We carried out correction work for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and we performed sinking correction work over a total construction area of approximately 350m2 over four consecutive nights. [Case Overview] ■ Construction Area: Approximately 350m2 ■ Maximum Sinking Amount: 93mm ■ Area: Ibaraki Prefecture ■ Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration