[Construction Case] Precision Machinery Factory: Floor Slab Settlement Correction Work
A case of correcting the subsidence, gaps, and voids under the factory's earthen floor in just two days during the factory's holiday!
We would like to introduce a case of "floor slab settlement correction work" and "void filling work under the floor slab" carried out at a precision machinery factory in Kagoshima Prefecture. There were voids and cavities of about 30 to 40 mm under the factory's floor slab, and due to the settlement of the floor along with the columnar improvements, a correction request was made to Upcon. The construction was completed over two days during the factory's holiday weekend. After the work was finished, we received a thank-you email from the customer stating, "It was successfully lifted, and we were moved." 【Case Overview】 ■ Construction Area: Approximately 480 m² ■ Maximum Settlement Amount: 41 mm ■ Maximum Void Amount: 35 mm ■ Area: Kagoshima Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other