[Improvement Case] Key Points for Designing and Building Information Systems
An example of accurate information transmission to the field, starting with digital picking.
Here is an example of improvements in the production instruction system. While work instruction sheets on paper and the traditional Kanban method were effective for inventory management, there were instances where the loss of instruction sheets, ink shortages during printing on-site, and ink smudging caused disruptions in work. Therefore, we implemented a production system. This allowed for accurate information transmission to the site, such as instructions for parts assembly that were previously conducted on paper, including digital picking. [Examples of trouble factors] ■ Printing issues ■ Loss of work instruction sheets *For more details, please download the PDF or feel free to contact us.
- Company:東亜エレクトロニクス株式会社 東亜電機カンパニー
- Price:Other