[Maintenance Construction Example] Wall Painting Work
The factory has become brighter than before due to the change to a lighter color on the walls!
We would like to introduce a case from a customer who plans to paint the walls of the packaging area in their factory within the half-year budget. Immediately after receiving the request, we visited the site with the painting contractor to conduct an on-site survey to determine the extent of the area to be painted and to check for repair spots and cracks. We submitted an estimate for painting an area of 300m2 with two coats, as well as for hole repairs and crack repairs. Additionally, at the customer's request to change the wall color, we mixed the desired color from the color sample book and carried out the construction. [Case Overview] ■ Industry: Medical Manufacturer ■ Target: Factory Interior Walls ■ Request Details: Wall Painting and Repairs ■ Construction Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
- Company:酒重
- Price:Other