[Case Study on Solutions for Small Lot and Diverse Product Systems] Industrial Equipment Power Supply / Automotive Air Conditioning Manufacturing
By increasing versatility and multi-engineering capabilities, we can accommodate small lot production!
We will introduce a case study of problem-solving for the production line of industrial equipment power supplies and automotive air conditioners proposed by Aiden Corporation. At the site we consulted, the production capacity for small lot, diverse product manufacturing was 1 to 100 units per month. Therefore, we proposed a line built with suitable process design to match the requested lead time. After implementation, there were zero specification errors for small lot products, and through multi-skilled workers and multiple processes, we achieved leveled production and became capable of handling small lot products. 【Case Study】 ■ Product - Industrial equipment power supplies / Automotive air conditioners ■ Production System - Small lot, diverse product manufacturing: 1 to 100 units per month ■ Proposal - Constructed a line with suitable process design to match the requested lead time ■ Results - Zero specification errors for small lot products - Achieved leveled production and capability for small lot products through multi-skilled workers and multiple processes *For more details, please refer to the external link or feel free to contact us.
- Company:アイデン
- Price:Other