[Maintenance Construction Case] Anchor Fixing Work
Immediately after receiving the request, we conducted a verification operation on-site! A case where the floor load capacity was calculated and constructed.
We would like to introduce a case where anchor fixing work was carried out to prevent the tipping of equipment and machinery within the factory. Immediately after receiving the request, we conducted a site inspection. First, we checked the condition of the space under the floor, as the length of the anchors varies depending on the underfloor conditions. Additionally, since the legs of the anchors can break, we calculated the load-bearing capacity of the floor and proceeded with the installation. 【Case Overview】 ■ Industry: Automotive Parts ■ Subject: Anchors ■ Request Details: Anchor fixing work ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).