0098 Resolution of powder blockage in a vertical pipe with a diameter of 250 mm.
This is an introduction to a case study on resolving powder blockage in a vertical pipe with a diameter of 250 mm.
A blockage occurred in the vertical pipe (250φ×300L) between the powder feeder for raw material measurement and the raw material hopper, so we installed a Bro-Disk Mini to resolve the issue. In this case, the user had originally installed an air knocker on the upper raw material hopper due to the inherently poor flowability of the powder. However, after changing the source of the raw material recently, blockages began to occur in the vertical pipe below the hopper, leading them to install an air knocker there as well, but it had little effect. Subsequently, they became interested in the Bro-Disk, and after testing it, they achieved a 100% resolution. For blockages in chutes and pipes containing powder, air aeration and vibration-type bridge breakers, as well as the Bro-Disk Mini, are effective. *We have many case studies published on our website. You can check them via the link below.
- Company:ミナギ
- Price:Other