[PI System Implementation Case] Sandvik Coromant Company
A battle against time! The journey from PoC of Industry 4.0 to "value realization on a company-wide scale."
In 2015, Sandvik Coromant embarked on a pilot project for a Proof of Concept (PoC) to track, manage, and optimize equipment performance using our "PI System." While the project team requested a 10-week grace period to demonstrate value, management demanded proof in just 4 weeks. As a result, the project team was able to quickly model each system using the Asset Framework of the PI System, ingest data from a wide range of diverse sources, analyze it, and provide rapid feedback on the results. These tools from the PI System proved to be a significant aid for the time-constrained project and led to a successful demonstration. [Overview] ■ Client: Sandvik Coromant ■ Industry: Manufacturing - Industrial Machinery Manufacturing ■ Product Implemented: PI System *For more details, please refer to the PDF document or feel free to contact us.
- Company:AVEVA
- Price:Other