[Construction Example] Warehouse, Office, Training Center (Chiba Prefecture)
Introducing a construction case of a warehouse that also includes a crane training facility in the office building.
We will introduce examples of "system construction" that allow for the selection of suitable roofs, walls, and structures based on the purpose and size of factories and warehouses, as well as regional environmental factors, achieving short construction periods and low costs. In a warehouse, office, and training center (Chiba Prefecture), automatic racks are installed inside the warehouse, and solar panels are planned to be installed on the roof for future use. An office building is also attached, and within the building, there is a spacious warehouse equipped with a crane training facility. 【Construction Example】 ■ Completion Date: March 2013 (Heisei 25) ■ Location: Chiba Prefecture ■ Total Floor Area: 7,206 m² (2,179.82 tsubo) *For more details, please download the PDF or feel free to contact us.
- Company:川田工業 建築事業部
- Price:Other