We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for BIM software.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

BIM software Product List and Ranking from 8 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

BIM software Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. トリンブル・ソリューションズ Tokyo//software
  2. ベクターワークスジャパン Tokyo//IT/Telecommunications
  3. SB C&S Tokyo//IT/Telecommunications
  4. グラフィソフトジャパン Tokyo//software
  5. 5 図研アルファテック Kanagawa//CAD/CAM

BIM software Product ranking

Last Updated: Aggregation Period:Feb 18, 2026~Mar 17, 2026
This ranking is based on the number of page views on our site.

  1. Vectorworks Fundamentals 2025 ベクターワークスジャパン
  2. [BIM Software Implementation Case] Heating Furnace for Oil Refining Plant トリンブル・ソリューションズ
  3. BIM tools for architecture, civil engineering, and construction execution [AEC Collection] SB C&S
  4. [Tekla Structures Domestic Utilization Case] Shobutani Co., Ltd. トリンブル・ソリューションズ
  5. Quickly create 3D models from survey data using architectural BIM. グラフィソフトジャパン

BIM software Product List

61~84 item / All 84 items

Displayed results

[BIM Software Implementation Case Study] Stadium (Sochi, Russia)

We would like to introduce a case where a massive curved roof structure was realized using Tekla!

Inspired by the Easter egg of a Russian jeweler, the stadium designed features integrated walls and a roof that shine in the sunlight, attracting attention as a beautiful stage. The stadium is a steel structure with a gently curved, massive shape, requiring advanced technology for calculations of beam nodes and dimensions of joints with the basic structure. Additionally, during the modeling process, Mostproekt discovered that the size of the joint components posed transportation issues and conducted simulations on the Tekla model to create alternatives. As a result, by manufacturing products that consider shipping conditions, potential troubles were prevented. "Tekla Structures" played a significant role in solving such issues. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Guacolda Coal-Fired Power Generation Facility

Introducing examples of overcoming communication barriers such as time differences, distance, and different languages!

We would like to introduce the construction of coal-fired power generation facilities in the Republic of Chile, South America, which Mitsubishi Heavy Industries, Ltd. received an order for in 2006. Chile, the manufacturing site, is located exactly on the opposite side of the Earth from Japan. The time difference, geographical distance, and different languages pose significant obstacles to information communication in design, manufacturing operations, and their process management. To address this, the company utilized "Tekla Structures" to accumulate and manage all information from design to manufacturing within a single 3D model. By doing so, they maintained consistency of information between the design site in Japan and the manufacturing site in Chile, aiming to reduce rework and inconsistencies in design and manufacturing operations. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • Software (middle, driver, security, etc.)
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Brominmaki Wastewater Treatment Facility

Structural design is carried out entirely based on BIM! We will introduce a case that achieved the management of a vast amount of data.

The new wastewater treatment facility being constructed in Blominmäki, Espoo, Finland, has a high processing capacity and can remove 99% of phosphorus from water. This facility, which has buildings and storage tanks installed on a site of over 10 hectares, utilizes Nordic construction methods for underground excavation. The project is diverse and presents many challenges, while also featuring a very interesting design. The biggest challenge has been managing the vast amount of data handled in the project. The design employs numerous modeling software, including "Tekla Structures" and "Trimble Connect." Additionally, all structural design is carried out based on BIM and is modeled in greater detail than the level of detail (LOD) specified by Finland's COBIM. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Tripla Project

Expanding the scope of BIM application and demonstrating its effectiveness in various processes! Case studies from large-scale construction sites.

The development project of Tripla, located in the center of Pasila, Helsinki, the capital of Finland, utilizes BIM tools for various design tasks. The project's procurement team efficiently calculates quantities of construction materials by leveraging the BIM model. "Tekla Structures" allows for the aggregation and classification of cost estimation information under various conditions, enabling the visualization of costs at detailed levels, such as by work process or contractor, which aids in accurately understanding estimated prices. Additionally, the Tekla model has achieved significant results in examining the feasibility of construction, such as investigating the delivery routes for escalators to be installed within the building. [Case Overview] ■ Implementation Site: Tripla Project (Helsinki, Finland) *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special site below⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] Karasuma Racecourse Redevelopment Project

Tekla is effective for designing buildings with large curves! Examples from redevelopment projects such as spectator stands.

The redevelopment of the Karasuyama Racecourse is a project to construct world-class facilities. The company responsible for the project is handling everything from design to detailed design, manufacturing, and the construction of the main viewing stand roof using a 45-meter cantilever beam. The very complex roof shape had significant restrictions on deflection and allowable tolerances, but by utilizing "BIM" and "Tekla Structures," they conducted precise detailed design that considered the use of fabrication drawings. [Case Overview] ■ Challenge: The very complex roof shape had significant restrictions on deflection and allowable tolerances. ■ Results - Achieved precise detailed design that considered the use of fabrication drawings. - Tekla is very effective for designing buildings with large curves, like the Karasuyama Racecourse. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] UAE Pavilion at the Dubai International Expo

Completing the project through collaboration! Introducing case studies of implementation in commercial facility construction.

The National Media Council of the United Arab Emirates adopted the design proposal by architect Santiago Calatrava for the UAE Pavilion at the 2020 Dubai International Expo. In July 2017, Arabtec Construction, a 100% subsidiary of Arabtec Holding, which is responsible for infrastructure development, won the construction contract for the pavilion. Despite facing various challenges, including a very tight deadline and the fact that all major rib materials were cambered, we received positive feedback stating, "Thanks to Tekla Structures and Tekla BIMsight, we were able to complete the project while collaborating effectively." [Challenges] ■ Very tight deadline ■ Composed mostly of beams joined with special specifications ■ All major rib materials are cambered *For more details, please refer to the PDF document or feel free to contact us. (If the PDF button is not displayed) ⇩The catalog can be downloaded from the special website below⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case Study] 2020 Dubai International Expo

Easily coordinate with other stakeholders! Here is an example of how we solved challenges with "Tekla Structures."

We would like to introduce a case study of BIM software implementation at the "2020 Dubai International Expo Mobility Pavilion." In this project, Tiger Steel was responsible for everything from the detailed design and fabrication of the steel structure, including the examination of joints, to construction. The three-dimensional structure and complex joints were very challenging, but this was resolved by using "Tekla Structures." The biggest advantage of using this software is that it makes coordination with other stakeholders easier. [Case Overview] ■ Challenge: The three-dimensional structure and complex joints were very difficult. ■ Result: This was resolved by using Tekla Structures. ■ Benefit: Coordination with other stakeholders became easier. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Modeler
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[BIM Software Implementation Case] Maren Corporation's Circulating Fluidized Bed Boiler

Improvement in detailed design of joints through modeling! A case where design errors were minimized.

We would like to introduce a case study on the implementation of BIM software in the design of Maren's Circulating Fluidized Bed (CFB) boiler. In this project, the use of "Tekla Structures" was essential for coordinating and adapting various piping and structural designs across different sections. Tasks were allocated early in the bidding phase, and effective detailed design of joints allowed for quick generation of drawings, minimizing design errors. At the points where structural steel components connect to the plant piping supports, structural members either converted IFC data to raw data of the same product or referenced IFC as information to be displayed in product drawings for verification. High-level detailed design has led to zero errors. *For more details, please refer to the PDF materials or feel free to contact us. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special website below ⇩

  • 2D CAD Construction
  • 3D CAD
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Domestic Utilization Case Studies] Steel Frame Detailed Modeling

A case study utilizing Tekla Structures for steel detailing modeling has been published in the "Nikkankensetsu Tsushin Shimbun."

By downloading the PDF, you can view the catalog for the structural BIM software 'Tekla Structures' (Steel Detail Modeling) and case study articles on its use in Japan. (If the PDF button is not displayed) ⇩ Case study articles can be downloaded from the special site below ⇩

  • 3D CAD
  • antenna
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Domestic Utilization Case Studies: Detailed Modeling of Concrete

A case study utilizing Tekla Structures for detailed concrete modeling has been published in the "Daily Construction Communication News."

By downloading the PDF, you can view the catalog for the structural BIM software 'Tekla Structures' <Concrete Detailing Modeling> and case study articles on its use in Japan. (If the PDF button is not displayed) ⇩ You can download the case study articles from the special site below ⇩

  • 3D CAD
  • 2D CAD Construction
  • antenna
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Tekla Structures Domestic Utilization Case] Shobutani Co., Ltd.

A case study utilizing Tekla Structures was featured in the "Nikkankensetsu Tsushin Shimbun."

On May 31, 2023, our customer's case study was featured in the BIM special edition of the "Daily Construction Communication Newspaper." "Standardization within the Company using Tekla" Shobutani Co., Ltd., a steel fabricator, is recognized as a pioneering company with nearly 20 years of experience in implementing Tekla. In the published article, they shared their journey with Tekla and their future outlook. Please take a look. (If the PDF button is not displayed) ⇩ The catalog can be downloaded from the special site below ⇩

  • antenna
  • 2D CAD Construction
  • 3D CAD
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Six Things to Check When Introducing BIM" Basic Knowledge Materials Provided!

A must-read before introducing new BIM or replacing existing ones! A compilation of checkpoints to consider for selecting the appropriate BIM solution!

Choosing which BIM software to select is a very important factor related to a company's competitiveness. There are many points to consider when selecting a BIM solution and many things to confirm with each vendor, but we have summarized the six most important points in a checklist. Please make use of this when implementing BIM. 【Content (Excerpt)】 《check1》Sharing BIM information among project participants 《check2》Efficient modeling and flexible response to design changes 《check3》Smooth editing of BIM models for large projects ⇩ You can download the continuation of the checklist and details from the special site or the PDF button below ⇩

  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Tekla Structures Domestic Case Study] Takenaka Corporation

A case study utilizing Tekla Structures was published in the "Daily Construction Communication News."

In the November 29, 2024 issue of the "Daily Construction Communication Newspaper," a case study from our client was featured. "First in Japan to Apply 'Approval Within BIM Model'" The major general contractor, Takenaka Corporation, has completely eliminated traditional 2D detailed drawings and was the first in Japan to apply "Approval Within BIM Model." "We accomplished everything with the Tekla model instead of creating detailed drawings. The approval process has been shortened for both the general contractor and the steel fabricator due to the approval within the model, leading to a reduction in the creation of detailed drawings," they discussed the effects. For more details on this initiative that overturns the conventional wisdom of "not relying on drawings," please check out the article.

  • antenna
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

What is the digital twin that holds the key to construction DX? An explanation of the benefits of BIM collaboration.

We are offering materials that explain the role of 'Digital Twin', which is gaining attention in the construction industry, and the benefits of the integration of Digital Twin and BIM!

Have you ever heard the term "digital twin"? The digital twin, which creates a complete digital replica of real-world objects, is gaining global attention, particularly in the manufacturing and construction industries. This document provides a clear explanation of the concept of digital twins, their role in the construction industry, and the benefits of integrating digital twins with BIM, among other noteworthy backgrounds. If you are interested in industry reforms such as construction DX, please read on. [Contents (excerpt)] ■ Diverse applications of digital twins ■ Digital twins and the construction industry ■ BIM and digital twins are a perfect match ■ Benefits of digital twins *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM software [Revit] world standard tool

BIM software that excels in all aspects such as design, structure, equipment, and construction is 'Autodesk Revit'.

◆What is BIM? An abbreviation for Building Information Modeling. It is a "concept" aimed at improving the productivity of building design and construction. The Ministry of Land, Infrastructure, Transport and Tourism is promoting the BIM acceleration project for architecture in 2023 and the application of BIM/CIM principles for civil engineering, leading to the adoption of BIM not only by large general contractors but also by small and medium-sized enterprises. ◆Main Features of Autodesk Revit - A world-standard BIM tool for structural design - Active in all processes including design, structure, equipment, and construction - Prevents rework by creating building models that closely resemble the actual structure - Enables collaboration and modifications anytime and anywhere by utilizing cloud features There are various other functions and benefits! *For more details, please refer to the materials or feel free to contact us.

  • 3D CAD
  • Modeler
  • Workflow System
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 1

The opening of the "ROOFLAG Rental Housing Future Exhibition Hall," a wooden large-roofed building that is one of the largest in the country, has been realized through the utilization of BIM.

We would like to introduce a case study where Daito Trust Construction Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> Daito Trust Construction opened the "ROOFLAG Rental Housing Future Exhibition Hall," a facility aimed at considering the future of rental housing. This was their first experience using large CLT panels as beams, and the project progressed in a trial-and-error manner without knowing where the challenges lay. <Issues and Reasons for Implementation> - It was difficult to consider the construction procedures and quality assurance of the large roof using only 2D drawing information. - They wanted to utilize a BIM model to understand the entire building. <Implementation Results> Please check the PDF document for details!

  • 3D CAD
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 2

Expansion of telework and improvement of productivity through Revit and BIM360.

We would like to introduce a case study where Sakura Draft Works Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> In the architecture industry, the demand for equipment design using BIM is rapidly expanding, and Sakura Draft Works, which handles BIM software, is receiving a steady stream of requests for equipment design and modeling both domestically and internationally. The scope of operations and productivity have improved, and they are now considering overseas expansion. <Utilization Methods and Implementation Results> Please check the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 3

Based on the BIM model, analyze the optimal louver angle and pitch using generative design.

We would like to introduce a case study where Sato General Planning Co., Ltd. utilized Autodesk's BIM software "Revit." <Overview> Clients often present conflicting conditions, and in the past, decisions were typically made by selecting one option from two or three proposals. However, this approach did not ensure that the chosen design was truly optimal or that it could be adequately explained to the client. Therefore, the company began developing a new design methodology that seeks optimal design values using Revit. <Issues and Reasons for Implementation> - How to maximize the environmental performance of buildings within a limited budget. - While the shadow analysis function can determine the amount of sunlight entering the building, it is challenging to find the optimal louver angle that meets conflicting conditions such as "warm in winter and cool in summer." <Results of Implementation> For more details, please refer to the PDF document.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 4

A seamless process from design to construction with a single model incorporating the BIM model. Almost no rework!

We would like to introduce a case study of how Honma Corporation utilized Autodesk's BIM software "Revit." <Overview> Honma Corporation began its design BIM efforts in 2013 and construction BIM efforts in 2018, steadily advancing its use of BIM. The culmination of these efforts was the new construction project for the relocation of Isuzu Motors' Nagaoka branch, completed in 2020. What was the method of utilization that allowed for the project to be completed with almost no rework? <Results> Please check the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 6

The Future of Architecture and Mobility Illustrated by Takenaka Corporation × Mercedes-Benz EQ House

We would like to introduce a case study of how Takenaka Corporation utilized Autodesk's BIM software "Revit." <Overview> The EQ House, which emerged in Roppongi through a collaboration between Mercedes-Benz and Takenaka Corporation, adopts a spatial configuration that envisions mobility entering the home, creating a place where one can experience the future of living connected to mobility. How were BIM software Revit and BIM360 utilized to realize this project? We will present the case study. <Implementation Results> For more details, please check the PDF document.

  • 3D CAD
  • Other CAD related software
  • 2D CAD Construction
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 10

Achieving improved client satisfaction through the implementation of BIM workflows!

We would like to introduce a case study of how TDIndustries (USA) utilized Autodesk's BIM software "Revit." <Overview> In response to increasingly complex projects and the demand for excellent buildings to be completed in a short period, TDIndustries adopted Autodesk's Revit to significantly enhance its competitiveness. The company states, "To deliver better products to our customers, we must evolve alongside technology and make the most of our tools." We will present the methods they used to improve constructability and customer satisfaction. <Implementation Results> Please refer to the PDF document for more details.

  • 3D CAD
  • 2D CAD Construction
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BIM Software [Revit] User Case Vol. 12

Automating Revit's design functions to improve productivity! A strategy for transitioning from manual work to programming-based BIM.

We would like to introduce a case study of Sato Kogyo Co., Ltd. utilizing Autodesk's BIM software "Revit." <Overview> In preparation for the increasingly severe labor shortage era, Sato Kogyo is working on automating the creation of BIM models and drafting, which were previously done manually, through programming. The tool that serves as their weapon for this is "Dynamo," a visual programming tool developed to automate software like Revit. How did they achieve automation and improve productivity? We will present the case study. <Implementation Results> Please check the PDF document for more details.

  • 2D CAD Construction
  • 3D CAD
  • Other CAD related software
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Recommended models for the BIM software "ARCHICAD"

An efficient and intuitive BIM software! You can naturally create BIM data while focusing on design.

"ARCHICAD" is software that has been developed for over 30 years with a focus on functionality as a BIM, ease of use, and ease of implementation. It streamlines operations at various stages of design and construction in the architecture industry, facilitating processes. It creates an environment where designers can concentrate on design, while supporting productivity improvements at construction sites. At Applied, we offer the 'Be-Clia CAD Type-S12IS series / Be-Clia CAD Type-M12IS series' as recommended operating models. 【ARCHICAD Features】 ■ Designer's approach ■ Ease of learning ■ High performance ■ Multi-platform ■ OPEN BIM ■ Global ■ CAD SHOP collaboration model *For more details, please refer to the related links or feel free to contact us.

  • 2022-04-11_10h13_32.png
  • 2022-04-11_10h13_38.png
  • 2022-04-11_10h13_44.png
  • Other PCs and OA equipment
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Seminar] Daiwa House Industry Co., Ltd.'s Offensive and Defensive DX Development

Revealing the secrets to successfully achieving DX by maximizing the value chain using construction data!

Our company will hold a seminar titled "Daiwa House Industry Co., Ltd.'s Offensive and Defensive DX Development." The company is promoting construction DX aimed at "industrialized construction" based on BIM. In this context, we will explain the organization of a value chain platform utilizing construction data, divided into two parts: "defensive," focusing mainly on operational efficiency, and "offensive," contributing to profit improvement, along with case studies. We will detail the secrets to successfully implementing DX. 【Seminar Details】 ■ Date and Time: January 22, 2024 (Monday) from 1:30 PM to 3:30 PM (Doors open at 1:00 PM) ■ Venue: JPI Conference Square ■ Address: 5-2-32 Minamiazabu, Minato-ku, Tokyo, Kowa Hiroo Building ■ Participation Method: In-person, live streaming, archived streaming ■ Speaker: Mr. Takaaki Miyauchi, Deputy General Manager of the Construction DX Promotion Department, Technical Headquarters, Daiwa House Industry Co., Ltd. and Director of Truss Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.

  • Technical Seminar
  • Management Seminar
  • Business Skills Seminar
  • BIM software

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration