Eldraine
A construction block that enables significant shortening of construction time by integrally molding the side wall of the tunnel surveillance passage and the circular water channel.
■ Significant shortening of construction time is possible. ■ Next work can be carried out immediately after block installation. ■ Blocks can be connected with bolts. ■ Smooth construction is possible. ■ The structure can absorb construction variations in the position of the drainage manhole up to 5 cm in either direction. ■ Space for installing electrical conduits, drainage pipes, etc., inside the auditor's passage is secured to be equal to or greater than that of conventional on-site casting. ■ The structure is designed to minimize the likelihood of debris getting caught in the slits. ■ The circular waterway section considers T-25 direct and side load in the longitudinal direction. ■ The shape is designed with consideration for construction machinery (set form, slip form).
- Company:昭和コンクリート工業
- Price:Other