The mega-solar construction on slopes and slope renovation work is highly effective! It can lift up to approximately 95 meters and achieves a high-speed hoisting of 30 to 35 meters per minute!
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is actively used as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega-solar installation sites and civil engineering construction sites. It allows for safe operations with a focus on improving work efficiency, reducing costs, and ensuring compliance.
It can also be used for slope work beside railway tracks, stair renovation work, dam renovation work, and highway slope work.
The rail length can be customized up to a maximum of 95 meters to suit the site. A 1000W winch enables high-speed lifting at 30 to 35 meters per minute.
*It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!*
【Features】
■ Capable of hoisting up to approximately 95 meters of rail length customized to the site
■ Achieves high-speed lifting of 30 to 35 meters per minute with a 1000W electric winch
■ Rail length and type of trolley can be customized to suit the site
■ Wire rope length can be used up to a maximum of 100 meters
■ Two types of electric winches to choose from
*For more details, please refer to the catalog or feel free to contact us.*