[Example] Load Test of Emergency Generator
Become a reliable generator during disasters! We will introduce examples of load testing for emergency generators.
We would like to introduce a case of the "Emergency Generator Load Test" conducted by our company. In the high-voltage generator load test, cables are laid from the high-voltage load testing machine to the target generator, and after insulation treatment, they are connected. The generator is started, the load rate is set according to the output, and the generator capacity is confirmed. We accommodate load tests of 30% in accordance with the Fire Service Act and 100% load tests for new installation sites. Additionally, our company possesses equipment capable of adapting to various situations, such as placing testing machines on high floors, underground levels, and public roads. 【Case Study】 ■ High-Voltage Generator - Capacity: 500 kW / Voltage: 6600 V - Response Time: 1.5 days / 20 m of cable on the ground floor ■ Low-Voltage Generator - Capacity: 120 kW / Voltage: 200 V - Response Time: 0.5 days / 15 m of cable on the ground floor *For more details, please refer to the PDF document or feel free to contact us.
- Company:ジン・プロダクトライン
- Price:Other