[Heat Insulation Construction Results] Improvement Case: T Automobile Warehouse
Temperature rises by 3 degrees in winter! Introducing a case study of heat insulation work at the engine shipping area.
We would like to introduce our achievements in heat insulation construction using the heat insulation material "Reflectix." It has been adopted for the roof of the engine shipping area at T Automobile. In winter, the temperature increases by 3 degrees. In summer, it becomes so comfortable that it is hard to believe you are working under a metal roof exposed to the scorching sun. 【Case Study】 ■ Client: T Automobile ■ Installation: Roof of the engine shipping area ■ Effect: Temperature increase of 3 degrees in winter In summer, it becomes so comfortable that it is hard to believe you are working under a metal roof. *For more details, please refer to the PDF document or feel free to contact us.
- Company:辰建 リフレクティクス東京中央支部
- Price:Other