[Improvement Idea] Leveling the assembly line with a pacemaker.
Visualize work elapsed time with the takt time function to achieve leveling and stabilize work quality!
**Customer Challenges** In assembly processes with long working hours, it is difficult to proceed with work based solely on a sense of time derived from experience, leading to variability in working hours. **Proposed Solution** By installing a pacemaker that makes the elapsed working time visible, it becomes possible to proceed with work at standard labor hours, resulting in both leveling and stabilization of work quality. ↓↓↓ Official Online Shop PATLITE SHOP Listing Page ↓↓↓
- Company:パトライト
- Price:Other