[Case Study of Drawing Management System] Yano Special Automobile Co., Ltd.
Contributing to the efficiency of drawing management operations with flexible customization! We respond to all detailed requests. Introduction of case studies for drawing management system implementation.
We would like to introduce a case study of the implementation of "Hi-PerBT Advanced Drawing Management" at Yano Special Vehicles Co., Ltd., which is engaged in innovative vehicle manufacturing centered around special vehicles. The company faced challenges such as the time-consuming verification process due to issues like recognition rates when registering drawings, and the need for manual corrections later, which resulted in unnecessary time expenditure. After implementing our product, they expressed, "By centrally managing drawings and related materials, we have achieved significant efficiency in our workflow, and we are truly satisfied." [Challenges] - In the case of special vehicles with numerous drawings, they possess a vast number of output sheets, ranging from 250 to 300, until manufacturing is complete. - Each time, they had to manually write the vehicle number on the printed drawings, incurring significant labor and costs. - Human errors occurred due to the inability to share the updated drawings across departments. - Time was lost due to interruptions in work and the need to visit the factory for verification. *For more details, please refer to the PDF document or feel free to contact us.*
- Company:日立ソリューションズ西日本
- Price:Other