【Examples of ZEROSAI Implementation】 Chiba Prefecture Medical Center Construction Project Utilized pinpoint forecasts on-site to avoid the dangers of sudden heavy rain! Achieved weather DX using ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals.
Challenges on Site: Key Points in Evaluation
[Operational Environment]
- Install the [N Sensor] near the site office to manage rainfall and wind speed.
- Use the real-time wind speed values observed by the [N Sensor] to determine whether to stop crane operations.
- If the real-time rainfall observed by the [N Sensor] exceeds the standard value, issue a work stoppage directive.
[Purpose of Introduction]
- Due to the proximity to the sea and the absence of obstructions, the wind speed often exceeds the work stoppage threshold of 10 m/s two to three times a day. It is essential to understand wind conditions since crane operations must absolutely stop when wind speeds reach 10 m/s or more.
- When performing concrete pouring or painting work, operations cannot proceed if it rains, so it is crucial to predict, observe, and timely grasp the rainfall situation.
■ Proposal (Example)
For more details, please download the PDF.

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
Related product
Related catalog(9)





