【Water Drainage Test Vol.6】Completely dry the stacked T-pipes with air blow!
■Work: T-shaped pipe (double stacked)
■Result: Both the upper and lower sections were completely dried by air blow (successfully removed 100% of water droplets)
Our "Air Screw Nozzle" can completely remove water droplets from not only flat workpieces but also those with recesses and grooves, achieving "on-site" complete drying with just air blow. Therefore, there is no need for a drying process after draining.
We have published the entire test process on our YouTube channel below.
Seeing is believing.
Please witness the "amazing" air blow with your own eyes.
↓↓↓
https://youtu.be/q_F2nOK0KeU

Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Links
We are also publishing various water drainage tests for different works.