A new product for easily inspecting and connecting junctions of ceiling wires from indoors / Junction inspection opening.

■Overview of the Joint Inspection Opening
1. It consists of a mounting frame and a cover, with the ceiling finishing material fitted into the cover. The mounting frame is attached to the ceiling finishing material, and a stand is combined with the supporting material of the mounting frame, with a joint box mounted on the upper part of the stand.
3. A hole is drilled from inside the room into the ceiling finishing material, and the main body is fitted and installed into that hole. It can be installed neatly and easily without any discomfort.
4. It is installed on the ceiling surface at the location of the connection (joint) of the electrical wires in the ceiling space from inside the room.
5. The cover is opened to connect the electrical wires in the ceiling space. Closing the cover completes the process. Additionally, the cover can be opened for confirmation and inspection of the connection points. Connection replacement work can also be performed.
6. By providing a joint inspection opening in the ceiling, it allows for the inspection of the connections (joints) of the electrical wires in the ceiling space from inside the room. Furthermore, it enables connection replacement work for miswiring or connection failures without damaging the ceiling finishing material.
7. By periodically inspecting the connection points of the electrical wires in the ceiling space, it is possible to prevent equipment damage and fires caused by abnormal heat due to overload or connection failures.
Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration
Related Documents
Related Links
By installing the joint inspection port on the ceiling surface from inside the room, it allows for easy inspection of wiring joints and connections in the ceiling space, which could potentially lead to a fire, by opening the cover from inside the room.