New product of sealing unit that facilitates electrical work for building renovations and extensions.
■Features of the Sealing Unit (Installation) 1. Wiring in the ceiling and installation of wiring devices can be done from indoors after the ceiling work is completed. 2. Wiring in the ceiling and installation of wiring devices for various electrical works during building renovations and extensions can be easily done from indoors. 3. Wiring in the ceiling and installation of wiring devices can be easily done from indoors without exposed wiring, preserving the interior design of the building, and achieving a good finish and appearance. Additionally, maintenance work becomes easier. 4. Construction time can be reduced (by half) and construction costs can be lowered (by one-third), allowing for safe work and easier electrical construction. ■Features of the Sealing Unit (Product) 1. It is a round inspection opening (entry point) with wiring devices that can be installed on ceiling finishing materials. 2. It has a good appearance and can be easily installed with a one-touch mechanism. 3. There is no need for repair work on ceiling finishing materials or ceiling base materials, and no specialized contractors are required. 4. It can be installed on ceilings without base materials (such as traditional Japanese room ceilings). 5. Installation or replacement of wiring devices can be easily done on the floor surface instead of the ceiling surface (by removing the cover). 6. Connection verification and inspection can be performed without removing wiring devices, and the direction and arrangement can be freely changed (by removing the cover) (changing the direction of the cover).
Inquire About This Product
basic information
■Overview of the Sealing Unit 1. It consists of a mounting frame and a cover, with the cover fitted with ceiling finishing material. The mounting frame can be attached to a sealing hole (round cable entry point) in the ceiling finishing material, and the cover is equipped with wiring devices and various sensors. 2. A hole is made in the ceiling finishing material from inside the room, and the sealing hole is fitted and installed into that hole. The ceiling finishing material with a hole is fitted into the cover, wiring devices are attached to the cover, and then the cover is attached to the main body to complete the installation. 3. The cover of the sealing hole is opened, and a cable catcher or arm is inserted through the hole into the ceiling space. Wires are then routed from inside the room to the ceiling space and connected to the wiring devices attached to the cover. 4. For example, a cable catcher (structured like a fishing rod) is inserted and extended from one sealing hole into the ceiling space, and a wire is hooked onto the tip from the other sealing hole. By pulling the cable catcher back, the wire is routed into the ceiling space and connected to the wiring devices attached to the cover. 5. In this way, the entry, wiring, and installation of devices in the ceiling space can be completed collectively after the ceiling work is finished.
Price information
Please feel free to contact us. (If you are interested in technology transfer or joint development, please reach out to us.)
Price range
P1
Delivery Time
P4
※Please feel free to contact us.
Applications/Examples of results
■Purpose 1. Used for various electrical works (high voltage, low voltage) in building renovations, extensions, and renewals. 2. Used for various electrical works (high voltage, low voltage) in new and existing buildings. 3. Used for works related to power, lighting, outlets, emergency lights, and other installations. 4. Used for works related to telephones, loudspeakers, intercoms, television distribution, security, automatic fire alarms, various control wiring, and information communication. ■Examples 1. Electrical work / Used as an entry point for various power lines in ceiling wiring. 2. Information communication work / Used as an entry point for IT communication lines and power lines in ceiling wiring. 3. Air conditioning work / Used as an entry point for refrigerant piping and control lines in ceiling wiring. 4. Used in security camera installation for security work.
Detailed information
-
Ceiling units that facilitate electrical work for building renovations and extensions. The new ceiling unit involves drilling a hole in the ceiling to install a sealing hole (round cable entry), wiring the electrical connections from indoors to the ceiling space, and attaching and connecting wiring devices and various sensors to the cover.
-
Floor unit for facilitating disaster prevention electrical and gas work under the floor. The new floor unit allows for drilling a hole in the floor to install a floor hole (round entry point), enabling electrical wiring to be routed from indoors to under the floor, and allows for the installation of devices such as smoke detectors and gas detectors on the back of the cover.
-
Easily facilitate electrical work under the floor / Floor unit The new ceiling unit allows for drilling a hole in the floor to install a floor hole (round inlet), wiring electrical connections from indoors to under the floor, and attaching wiring devices and various sensors to the cover.
catalog(7)
Download All CatalogsNews about this product(7)
Company information
Our company is engaged in the handling of new products related to electrical equipment located in Kameoka City, Kyoto Prefecture. ■ We develop, manufacture, and sell new products related to electrical equipment associated with construction. ■ We develop, manufacture, and sell new products related to temperature sensors for electrical devices. ■ We manufacture and sell the EOG monitoring system (ethylene oxide gas sterilization monitoring device). We have a rich product lineup to meet our customers' needs. Please feel free to consult with us. 【*If you are interested in our development products, technology transfer, or joint development, please feel free to contact us.】TEL: 0771-25-3430 Fax: 0771-25-4932 Mail: wadakame@siren.ocn.ne.jp