[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

This is an introduction to a case study implemented at a vehicle maintenance facility.
The work inside the vehicle maintenance facility was being conducted without air conditioning, but due to the ongoing extreme heat during the summer years, we were considering measures against heatstroke.
As a solution, we installed one spot bazooka unit in each vehicle maintenance lane, which is the main work flow, and also installed two additional spot bazooka units on the opposite side.
We considered various products, but after experiencing the actual machine at an exhibition, we decided on the Ease spot bazooka. The deciding factor was its high air volume, which allowed the air conditioning's cooling air to reach far, and after installation, the dehumidified dry air helped to dry sweat, creating a comfortable environment.
For more details, please refer to the related products and catalog.
【Implementation Overview】
■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility
■ Number of Units Installed: 7 Spot Bazooka Units
■ Installation Period: July 2020


Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration