[Heat Stroke Prevention Measures Case Study] Vaccination Concentration Venue

This is an introduction to the case of introducing "Spot Bazooka" at the concentrated vaccination site in Ayagawa Town, Kagawa Prefecture.
The gymnasium was suddenly designated as a vaccination site, but since air conditioning was not installed, measures against heatstroke and heat were necessary during vaccinations in the summer. Therefore, eight integrated units of the "Spot Bazooka," which require almost no construction, were introduced.
They were delivered in June during the rainy season, and during the trial run, a refreshing cool breeze with low humidity was emitted, which seemed to satisfy the town mayor and the townspeople.
For more details, please refer to the related products and catalog.
【Overview】
■ Installation site: Concentrated vaccination site in Ayagawa Town, Kagawa Prefecture
■ Installed product: Eight integrated units of "Spot Bazooka"


Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration