[Heat Stroke Prevention Case Study] Meiji Jingu Gaien Tennis Club

This is an introduction to the case of implementing the "Spot Bazooka" at the Meiji Jingu Gaien Tennis Club.
Due to the steel frame membrane roof structure, it was difficult to add air conditioning units, and despite various efforts, the indoor temperature would reach nearly 40°C on extremely hot days, leading to ongoing struggles with safety management and labor management.
After introducing our product, we have achieved the expected cooling effect, and we have received high praise from our members.
On September 23 at 1:00 PM, the outdoor temperature was 32.2°C, while the indoor temperature was 24.8°C, showing a measured drop of about 7°C compared to the outside air.
【Implementation Overview】
■ Location: Indoor court at Meiji Jingu Gaien Tennis Club
・Area: 4,531m²
・Ceiling height: 10.6m
■ Product introduced: Gup Pi Bazooka Single Type, 10 units (rated 4 horsepower, maximum 7 horsepower)


Inquiry about this news
Contact Us OnlineMore Details & Registration
Details & Registration