Consideration of methods for reinstalling power lines after the replacement of the iron tower.
In the tower foundation replacement construction, to omit temporary work, a temporary suspension of the power line will be done using a crane, and after the tower replacement, the power line will be returned again.
Inquire About This Product
basic information
【Features】 ○ In the case of tower base replacement work, if temporary construction is difficult, it becomes impossible to temporarily secure the power lines. ○ The method used this time is one that can be applied in locations where crane installation is possible, as temporary construction is difficult during the tower base replacement. ○ To shorten the construction period, it is necessary to calculate in advance the actual lengths of the power lines and the lengths of the guy wires before and after the tower replacement, taking into account the work procedures. ● For other functions and details, please contact us.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
Company information
March 1993: Company established. June 1993: Registered as a contractor with C-Tech Co., Ltd. September 1993: Registered as a contractor with Himeno Co., Ltd. November 1994: Registered as a contractor with Toenek Co., Ltd. December 1994: Commenced contracted work with Chubu Electric Power Co., Inc. July 1996: Head office relocated from Nagakute Town to Meito Ward, Nagoya City. June 2002: Registered as a contractor for land-related business transactions with Chubu Electric Power Co., Inc., Shizuoka Branch. April 2003: Registered as a contractor for land-related business transactions with Chubu Electric Power Co., Inc., Nagoya Branch. September 2006: Registered as a surveying contractor, Registration Number (1) 30674.