Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience gained from many years of roofing work for major housing manufacturers. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■O Residence, Gyoda City, Saitama Prefecture ■Construction Date: June 2008 ■Age of Building: Newly Built ■Construction Period (Installation): 2 days ■Selected Model Specifications: Sharp ■Support Structure Method: Support Tile Method ■Modules: ND-153AU, 27 pieces, 4.131 kW
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Results Case 10]](https://image.mono.ipros.com/public/product/image/99d/1377866003/IPROS_10859891291577268000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Achievement Case 35]](https://image.mono.ipros.com/public/product/image/9c3/1377866046/IPROS_12043173733207558000.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 49]](https://image.mono.ipros.com/public/product/image/314/2000112702/IPROS1939183065958599638.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 76]](https://image.mono.ipros.com/public/product/image/409/2000224570/IPROS6624761399241663506.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 540]](https://image.mono.ipros.com/public/product/image/d42/2000239268/IPROS5008458178261180518.jpg?w=280&h=280)
![[Seminar Video] A Thorough Comparison of the PPA Model and the Self-Investment Model](https://image.mono.ipros.com/public/product/image/ba8/2001174067/IPROS67912517204729079077.png?w=280&h=280)

![Solar power generation system [self-consumption type] for cost reduction and efforts towards SDGs.](https://image.mono.ipros.com/public/product/image/b87/2000492230/IPROS44316788877714805221.png?w=280&h=280)

![[Case Study] Special Nursing Home Sonosato](https://image.mono.ipros.com/public/product/image/017/2001174011/IPROS09378487409421656463.png?w=280&h=280)
![[Case Study] Construction Example of High-Temperature Facilities in Factories Using High-Performance Heat Insulation Sheets](https://image.mono.ipros.com/public/product/image/962/2000579577/IPROS04218491152233419232.jpeg?w=280&h=280)


