For correcting the slope and subsidence of earthen floors in factories, warehouses, and stores, use the "TerraTech Method."
TerraTech method
Correcting the slope, subsidence, and unevenness of the concrete floor without stopping. No need to move machinery. Available for surveys and construction 24 hours a day, 365 days a year across Japan!
We quickly correct the tilting, sagging, distortion, and steps of factory, warehouse, store, and shopping center floors caused by ground subsidence by injecting a special foamed urethane resin called "Teratec Resin." ◆ Teratec Method * A preliminary investigation of the voids under the floor will be conducted. 1. Measure the tilt of the floor. 2. Drill a 6mm diameter hole at the correction point. 3. Use proprietary equipment to inject resin under the floor slab. 4. The injected resin begins to expand instantly. This expansion force compresses and strengthens the ground, pushing the floor upward. 5. Corrections are made while measuring the floor movement in millimeters. ◆ Features of Teratec Resin ◎ Strong → Withstands a minimum load of 19 tons per square meter. ◎ Light → Weighs about 50kg per cubic meter (1/30 of mortar). ◎ Fast → Curing time is approximately 30 minutes, allowing heavy trucks to operate immediately after construction. Utilizing these features, we carry out short-term construction without stopping operations. The standard construction area per day (8 hours) is 200 square meters. We accommodate factories, warehouses, and stores ranging from 30 square meters to several thousand square meters. Please feel free to contact us. Toll-free number: 0120-873-835
Inquire About This Product
Related Videos
basic information
The floor tilted due to ground subsidence and the weight of the cargo. The shelves became slanted. If left as is, the items on the shelves may fall, the safety devices of the automatic transport racks may activate and stop functioning, leading not only to decreased work efficiency but also compromising safety. Until now, adjustments to the machine's level have been made using adjusters, or shelves have been raised as a temporary measure. "Teratec" will resolve that concern. With traditional floor replacement or reinforcement, business operations must be halted during the construction period. The construction costs are significant, and the loss of sales can be substantial, putting pressure on management. With the "Teratec Method," you can correct floor irregularities, tilting, and subsidence without stopping operations. If you are in charge of a factory, warehouse, store, or shopping center troubled by floor issues, please do not hesitate to contact us. Toll-free number: 0120-873-835 Our sales locations are in Sendai, Tokyo, Nagoya, Osaka, Okayama, and Fukuoka. We serve all of Japan with over 4,500 construction achievements! Our construction vehicles are 3-ton trucks.
Price information
After investigating the sinking volume and void volume, we will provide a design estimate. The inspection is free of charge, so please feel free to consult with us.
Delivery Time
P1
※First, we will conduct an investigation: measuring the floor's tilt and surveying the amount of voids under the floor.
Applications/Examples of results
**Main Construction Sites** Stores: Shopping centers, large retail stores, convenience stores, pachinko parlors, restaurants Warehouses: General warehouses, collection and distribution centers, logistics hubs, cold storage warehouses, platforms Factories: Various manufacturing plants, food factories, cold storage rooms, inspection rooms Schools: Classrooms, gymnasiums, auditoriums, school kitchens Public Works: Roads, pedestrian bridges, various airport facilities, schools, community centers **Main Clients** ▼ Government Agencies Kanto Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chubu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kinki Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Chugoku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Kyushu Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Hokuriku Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Aviation Bureau, Ministry of Land, Infrastructure, Transport and Tourism Tokyo Metropolitan Government, First Construction Office Iwate Prefecture, Department of Land Development Aomori Prefecture, Shimokita Regional Citizens Bureau Kyoto Prefecture, Civil Engineering Office Chiba Prefecture, Sewerage Public Corporation ▼ Private Companies Obayashi Corporation Kajima Corporation Taisei Corporation Takenaka Corporation Shimizu Corporation Daiwa House Industry Co., Ltd. Toda Corporation Mitsui Sumitomo Construction Co., Ltd. Ando & Associates Tokyu Construction Co., Ltd. Goyo Construction Co., Ltd. Maeda Corporation Fujita Corporation Nishimatsu Construction Co., Ltd. NIPPO Corporation
Detailed information
-
Investigation of Subfloor Cavities and Settlement Measurement A small 10mm hole is drilled in the concrete floor, and the area beneath the floor is visually inspected using an industrial endoscope. The photo shows a cavity that has formed beneath the floor, indicating that the concrete floor is suspended in the air. Settlement measurement involves checking the deflection, steps, and unevenness of the concrete floor using a level.
-
Teratec Floor Slab Settlement Correction An injection hose will be extended from a 3-ton plant vehicle. Hose extension is 90 meters. The injected resin expands, fills the voids (cavities) under the floor, and hardens. By continuing the injection, the expansion force pushes the floor upward.
catalog(10)
Download All Catalogs![[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.](https://image.mono.ipros.com/public/catalog/image/01/494/209281/IPROS62099550671294161372.png?w=120&h=170)
News about this product(11)
Company information
The main business activities of Mainmark involve "returning tilted floors and buildings to a level state" and "preventing existing floors and buildings from tilting." We primarily offer the "TerraTech Method," which allows us to level tilted floors without stopping operations, and we provide various construction proposals tailored to our customers' concerns, from investigation to execution. ■ Nationwide responsible construction with over 5,000 completed projects Mainmark has established offices in eight locations across the country and conducts responsible construction nationwide. We serve a wide range of clients, including factories, stores, warehouses, offices, and apartments. ■ Non-disruptive floor tilt and subsidence correction method "TerraTech Method" Our main service, the "TerraTech Method," is a patented technique that injects TerraTech resin (rigid polyurethane foam resin) into concrete floors that have developed tilts, subsidence, steps, or voids due to ground subsidence or earthquakes. The expansion force of the resin levels the sunken floor and fills the voids beneath it. This technology is also registered with the Ministry of Land, Infrastructure, Transport and Tourism's "NETIS," ensuring its reliability. Patent No. 4896949 "Method for Correcting Sunken Floors" NETIS Registration No. "QS-080007"