Responsibility for design and construction of solar power systems at Attic, without subcontracting.
Atiku is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience gained from many years of roofing work for major housing manufacturers. Since we do not subcontract, we can respond quickly to various customer requests while also keeping construction costs down.
Inquire About This Product
basic information
Kyocera Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P2
Applications/Examples of results
■U's residence, Funabashi City, Chiba Prefecture ■Construction date: February 2009 ■Construction period (installation and electrical work): 3 days ■Selected model specifications: Kyocera ■Mounting method: Direct bracket method ■Modules: SU60T・SU45T 3.23kw
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 40]](https://image.mono.ipros.com/public/product/image/145/2000002803/IPROS1976179951641895636.jpg?w=280&h=280)
![Solar Power Generation System [Construction Results Case 13]](https://image.mono.ipros.com/public/product/image/6d3/2000043986/IPROS2576188534491256419.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 116]](https://image.mono.ipros.com/public/product/image/bf5/2000124592/IPROS6370402021120181433.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 407]](https://image.mono.ipros.com/public/product/image/974/2000204866/IPROS293947051248929632.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 573]](https://image.mono.ipros.com/public/product/image/175/2000247530/IPROS6863695022417576158.jpg?w=280&h=280)

![[Article] Explanation of subsidies for solar power generation in Aichi Prefecture!](https://image.mono.ipros.com/public/product/image/c4a/2000704737/IPROS47481311375926390641.png?w=280&h=280)
![[Online Diagnosis in Progress] "O&M of Eiwatt's Solar Power Plant"](https://image.mono.ipros.com/public/product/image/c16/2000592466/IPROS42305847129123258566.jpeg?w=280&h=280)




![Amenities Meter: Creating a Comfortable Working Space with IoT [Work Style Reform]](https://image.mono.ipros.com/public/product/image/6fb/2001027009/IPROS12754886358639934309.png?w=280&h=280)