Filling the gap after sash insertion
Grouting of joints for block, stone wall, and tunnel construction arches. Filling gaps between prefabricated panels.
Inquire About This Product
basic information
【Specifications】 ○ Drive method: Diaphragm manual ○ Speed change method: Stroke adjustment ○ Discharge volume: 115–130 ml/stroke ○ Maximum discharge pressure: 0.3 MPa (3 kgf/cm²) ○ Transport distance: Horizontal 5 m or Vertical 5 m ○ Main body dimensions: W295 × L740 × H650 mm ○ Weight: 27 kg ○ Hopper volume: 10 liters ● For more details, please contact us or refer to the catalog.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
We anticipate market needs primarily in the construction and civil engineering industries, contributing to society through the creation and provision of new value. We provide optimal products, technologies, and services to our customers, ensuring a thorough commitment to a customer-first approach.