Presentation of case study on cost reduction through the introduction of weight transfer equipment.
Attention those struggling with smart factory implementation! We will introduce a case study of a company that successfully achieved a cost reduction of approximately 24 million yen!
Cosmo Giken aims to achieve the "ultimate efficiency" of our customers' factories by providing smart factories that utilize various AI technologies, IoT technologies, and big data technologies, ultimately significantly enhancing the "competitiveness" of those companies. You can download detailed materials summarizing the cost reductions and added value from actual implementations. ■ Features - Reduction of 3 workers with heavy work transfer equipment. - In 3 years and 4 months, the investment amount for heavy work transfer equipment exceeds the reduction in labor costs. - If the equipment is used for 10 years, there will be a labor cost reduction of 240 million yen even after deducting the introduction costs. - Issues identified from the beginning of production, such as the high risk of "heavy object transfer" and "handling of high-temperature materials," have been resolved through automation. - Production volume has doubled!
Inquire About This Product
basic information
For more details, please contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us.
catalog(12)
Download All CatalogsCompany information
Our company is a FA engineering firm focused on automation through robotics. We are a group of professional engineers responsible for production technology engineering, mechanical design (from basic design to detailed design), electrical control, assembly, and on-site installation and adjustment. By covering all total technologies related to FA in-house, we guarantee excellent engineering proposals and after-sales service.