Solar Power Generation System [Construction Record Case 233]
Mitsubishi 4.44kw PV-MX185HA
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on its extensive track record of roofing work for major housing manufacturers over many years. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Mitsubishi Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P3
Applications/Examples of results
■O's residence in Sakura City, Tochigi Prefecture ■Construction date: November 2010 ■Construction period (installation and electrical work): 6 days ■Selected model specifications: Mitsubishi ■Mounting method: Tile-type support brackets ■Module: 4.44 kW PV-MX185HA
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 40]](https://image.mono.ipros.com/public/product/image/1f3/2000104343/IPROS5516209952955957755.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 51]](https://image.mono.ipros.com/public/product/image/77a/2000112704/IPROS2503443456269414613.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 146]](https://image.mono.ipros.com/public/product/image/4c2/2000136070/IPROS4884612788584346346.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 526]](https://image.mono.ipros.com/public/product/image/3d9/2000235672/IPROS4368940058907633510.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 547]](https://image.mono.ipros.com/public/product/image/63a/2000239279/IPROS483248115928604690.jpg?w=280&h=280)
![[Case Study] Shinano no Hoshi Headquarters](https://image.mono.ipros.com/public/product/image/4d4/2001173976/IPROS70511111493290832255.png?w=280&h=280)

![[Seminar Video] A Thorough Comparison of the PPA Model and the Self-Investment Model](https://image.mono.ipros.com/public/product/image/ba8/2001174067/IPROS67912517204729079077.png?w=280&h=280)
![[For commercial facilities] Up to 29% reduction in electricity costs for self-consumption solar power in Sapporo City!](https://image.mono.ipros.com/public/product/image/2117111/IPROS18080550218724141878.jpg?w=280&h=280)


![Amenities Meter: Creating a Comfortable Working Space with IoT [Work Style Reform]](https://image.mono.ipros.com/public/product/image/6fb/2001027009/IPROS12754886358639934309.png?w=280&h=280)
