Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atiku is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on a wealth of experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Honda Solar Power Generation System Design and Construction
Price information
-
Delivery Time
P3
Applications/Examples of results
■K's residence, Kawasaki City, Kanagawa Prefecture ■Construction date: August 2011 ■Construction period (installation/electrical): 4 days ■Selected model specifications: Honda ■Mounting method: Folded plate roof method ■Module: 11.7kw HEM130PCB
Company information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar power generation system [Construction record Case 199]](https://image.mono.ipros.com/public/product/image/4ab/2000149268/IPROS2419092505092986731.jpg?w=280&h=280)
![[All-Electric Construction Case] Solar Power Generation System <2010>](https://image.mono.ipros.com/public/product/image/9ff/2001118512/IPROS17900836253036117933.jpeg?w=280&h=280)
![[Case Study] Special Nursing Home Sonosato](https://image.mono.ipros.com/public/product/image/017/2001174011/IPROS09378487409421656463.png?w=280&h=280)
![Solar Power Generation System [Construction Record Case 138]](https://image.mono.ipros.com/public/product/image/e34/2000136062/IPROS3896970615648104757.jpg?w=280&h=280)
![Solar power generation system [Construction record Case 170]](https://image.mono.ipros.com/public/product/image/6a5/2000140041/IPROS8275335541663161247.jpg?w=280&h=280)

![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)


