Repairing aging concrete pits in a short period of time!
The chemical company is facing difficulties as corrosion in the concrete pit has progressed, and they want to carry out repairs but cannot due to the tight construction schedule. Issues and Points: 1. The production plan allows for a maximum production stoppage period of only 5 days. 2. The current erosion status of the underlying concrete cannot be assessed. 3. If there is erosion in the concrete, the usual repair method would take more than 20 days. 4. There is a possibility that highly corrosive liquids may flow in, so the surface lining material must be highly resistant to corrosion and have low water absorption.
Inquire About This Product
basic information
We selected a substrate leveling agent that can be applied even if the underlying concrete is eroded, and proposed a construction method that uses highly corrosion-resistant materials for the lining and can be completed within 5 days. Points: 1. Use a fast-drying silica-based special substrate leveling agent that can be applied even if the underlying concrete is eroded, and complete the repair within 5 days. 2. The lining material will be made of strong FRP (Fiber Reinforced Plastic). 3. The topcoat of the FRP will use a heavy-duty anti-corrosion material that combines titanium-based substances with special silicone resin, which has low water absorption and permeability.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
In today's world, where advanced technological capabilities are required of all Japanese companies, we aim to be a trading company that not only embodies "integrity" and "technology," but also explores our customers' needs and responds to their requests, rather than being just a simple trading company.