Responsibility for design and construction of industrial solar power systems at Attic, without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design of solar power generation (including all-electric systems) to construction and aftercare, based on its extensive experience in roofing work for major housing manufacturers over many years. Since we do not outsource to subcontractors, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Sharp Solar Power System Design and Construction
Price information
-
Delivery Time
Applications/Examples of results
■Tochigi Prefecture, Mr. M ■Construction date: February 2015 ■Selected model specifications: Sharp ■Module: 18.0 kW ■Site area: 375 tsubo
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Industrial Solar Power Generation System [Construction Record Case 38]](https://image.mono.ipros.com/public/product/image/73d/2000182342/IPROS1678961307992623256.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Achievement Case 194]](https://image.mono.ipros.com/public/product/image/218/2000464000/IPROS01283439017044504635.jpeg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 44]](https://image.mono.ipros.com/public/product/image/fe0/2000182356/IPROS8848194627222507032.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 105]](https://image.mono.ipros.com/public/product/image/df9/2000262462/IPROS4418331018844666709.jpg?w=280&h=280)
![Industrial Solar Power Generation System [Construction Record Case 199]](https://image.mono.ipros.com/public/product/image/336/2000499254/IPROS31740146984479366947.jpeg?w=280&h=280)

![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)


