Solar power generation system [Construction record Case 551]
Noritz 4.09kw PVMD-P20501-SQ and others
Responsibility for design and construction of solar power systems at Attic without subcontracting.
Atik is a responsible design and construction contractor that handles total planning in-house, from the design to construction and aftercare of solar power generation (including all-electric systems), based on its extensive experience in roofing work for major housing manufacturers over many years. Since we do not subcontract, we can respond quickly to various customer requests while keeping construction costs down.
Inquire About This Product
basic information
Noritz - Design and construction of solar power generation systems
Price information
-
Delivery Time
P2
Applications/Examples of results
■K's Residence, Mibu Town, Tochigi Prefecture, Shimotsuga District ■Construction Date: December 2013 ■Construction Period (Installation & Electrical): 2 days ■Selected Model Specifications: Noritz ■Mounting Method: Metal Horizontal Roofing (Short) ■Module: 4.09kw PVMD-P20501-SQ and others
catalog(1)
Download All CatalogsCompany information
We have 20 years of experience in the construction of roof structures for major housing manufacturers, and we are also utilizing that technology to engage in solar power generation. The era of households generating their own energy is upon us. Additionally, we will propose the introduction of an all-electric system focused on safety and comfort in renovations.


![Solar Power Generation System [Construction Record Case 121]](https://image.mono.ipros.com/public/product/image/e8f/2000130958/IPROS464180239656715250.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 122]](https://image.mono.ipros.com/public/product/image/2c7/2000130963/IPROS3043800352009554948.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 384]](https://image.mono.ipros.com/public/product/image/0d4/2000198400/IPROS7505658469484223399.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 465]](https://image.mono.ipros.com/public/product/image/d11/2000228477/IPROS5975006138573031246.jpg?w=280&h=280)
![Solar Power Generation System [Construction Record Case 78]](https://image.mono.ipros.com/public/product/image/653/2000230914/IPROS4289563727294369394.jpg?w=280&h=280)
![[For Commercial Facilities] Muroran City: Achieving both electricity cost savings and power outage measures with self-consumed solar power!](https://image.mono.ipros.com/public/product/image/2117111/IPROS16405979355836475567.jpg?w=280&h=280)
![[Column] How to Choose a Self-Consumption Solar Power Generation System for Businesses](https://image.mono.ipros.com/public/product/image/62f/2000667976/IPROS34619836471089912799.png?w=280&h=280)
![[Installation Example] Zenkoji Hakuba Electric Railway Co., Ltd. South Sales Office](https://image.mono.ipros.com/public/product/image/774/2000543471/IPROS34848322212658019304.png?w=280&h=280)




![Amenities Meter: Creating a Comfortable Working Space with IoT [Work Style Reform]](https://image.mono.ipros.com/public/product/image/6fb/2001027009/IPROS12754886358639934309.png?w=280&h=280)
